LUL - S1197

Signalling and Signalling Control - Design and Implementation

inactive
Organization: LUL
Publication Date: 1 November 2011
Status: inactive
Page Count: 44
scope:

This Standard applies to all running lines and depot areas of the London Underground railway that are signalled using conventional or transmission based technology. Unless specifically stated to the contrary, a requirement applies to signalling and signalling control systems for both running lines and depot areas.

This Standard focuses on requirements for second stage of the lifecycle, Design and Implementation. The totality of requirements contained within the complete suite of signalling and signalling control standards (see 5.1.2) must be complied with for these systems.

The issue of this standard replaces 1-197 A3

Purpose

The purpose of this Standard is to define the Signalling and Signalling Control Design and Implementation requirements which are mandatory to the design and

Document History

June 1, 2019
Signalling and Signalling Control - Design and Implementation
Suppliers involved in the design and implementation for signalling and signalling control systems using conventional or transmission based technology on both running lines and depot areas need to use...
November 1, 2011
Signalling and Signalling Control - Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...
November 1, 2011
Signalling and Signalling Control - Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground Railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...
November 1, 2011
Signalling and Signalling Control - Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...
S1197
November 1, 2011
Signalling and Signalling Control - Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...
October 1, 2009
Signalling and Signalling Control – Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground Railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...
October 1, 2009
Signalling and Signalling Control – Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground Railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...
April 1, 2008
Signalling and Signalling Control – Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground Railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...
April 1, 2008
Signalling and Signalling Control – Design and Implementation
This Standard applies to all running lines and depot areas of the London Underground Railway that are signalled using conventional or transmission based technology. Unless specifically stated to the...