UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - S2513

Alterations to the signalling system

inactive
Organization: LUL
Publication Date: 1 June 2015
Status: inactive
Page Count: 24
scope:

All planned changes, whether temporary or permanent, shall be carried out in accordance with this standard. Urgent unplanned temporary changes (to provide service in the event of failure conditions) will normally be carried out in accordance with S2530, Irregular adjustments to the signalling system, but may be carried out in accordance with S2532 if all its requirements can be met.

The requirements of this standard generally do not apply to exact like-for-like substitution of components, but may apply (in whole or in part) if extensive and simultaneous like-for-like replacement or reinstatement is planned, even where this does not depart from the existing design drawings. The Head of Signalling Engineering should be consulted for guidance in such cases.

This standard shall not apply to any train carried elements, but shall apply to:

a) any interfaces (such as power supplies, arrestors or point heaters) whose alteration might directly affect the safe operation of the signalling;

b) any integrity monitoring or enhancing features of the vital system. 

This standard does not address the safety assurance or design approval process required for new types of equipment, or the detailed planning and documentation of testing.

Purpose

This standard defines the requirements that must be followed when making any planned physical change to the vital signalling system for which LU is the Infrastructure Manager where that change involves either:

a) a departure from the existing design, or

b) a change of component type or version. 

In this document the terms 'alteration' and 'change' are equivalent, and mean any departure from the existing design, either in respect of component types or versions, or in their electrical or mechanical arrangements.

Document History

November 1, 2021
Alterations to the signalling system
This standard shall be used by all those responsible for the procurement, planning, design, installation or commissioning of alterations to the Signalling System. It shall be used when procuring,...
S2513
June 1, 2015
Alterations to the signalling system
All planned changes, whether temporary or permanent, shall be carried out in accordance with this standard. Urgent unplanned temporary changes (to provide service in the event of failure conditions)...
May 1, 2012
Alterations to the signalling system
All planned changes, whether temporary or permanent, shall be carried out in accordance with this standard. Urgent unplanned temporary changes (to provide service in the event of failure conditions)...

References

Advertisement