NR/L2/TRK/001/MOD11
Inspection & Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
| Organization: | NR |
| Publication Date: | 5 September 2015 |
| Status: | active |
| Page Count: | 25 |
scope:
This module of NR/L2/TRK/001 specifies, in relation to track geometry:
a) track geometry inspection;
b) track geometry measurement requirements;
c) action and associated timescales for the rectification of geometry faults;
d) the inspection and control measures required for sections of track for which recorded track geometry is worse than 'poor';
e) the requirements for managing dip angles;
f) retention of records.
Document History