LUL - T0515
Signalling equipment overhaul specification point escapement (4' and 6')
| Organization: | LUL |
| Publication Date: | 1 July 2022 |
| Status: | active |
| Page Count: | 27 |
scope:
This specification should be used by all those when engaged in the overhaul of all variants of Point Escapements (4' and 6').
Note: This specification is written to comply with Engineering standard S1202 in defining the requirements for the overhaul of all variants of Point Escapements (4' and 6') which are used in the signalling system on the London Underground.
Purpose
This specification details the overhaul requirements of the 4' and 6' Point Escapements which are used in the signalling system on the London Underground (LU).
Document History