This document references:
S1168 - Track Asset Walkways
Published by LUL
on
August 1, 2020
This standard applies to the following: a) All track asset walkways. b) Locations where trains are stabled at Sidings and Depot Sidings (as defined by the TfL Management System Glossary). This...
This document references:
G3212 - Composite conductor rail installation and maintenance
Published by LUL
on
March 1, 2016
The scope of this Track Handbook is to provide guidance for the methods and tools to be used when working with CCR. It covers the installation of CCR, its insulator supports, ramps, anchors, slipper...
This document references:
S1164 - Conductor rail – Conditions and Maximum permitted values
Published by LUL
on
September 1, 2021
This standard applies to all track including, plain line and junctionwork in open, sub-surface and tube sections and in depots. This standard applies to all approved conductor rail types and...
This document references:
S1168 - Track Asset Walkways
Published by LUL
on
August 1, 2020
This standard applies to the following: a) All track asset walkways. b) Locations where trains are stabled at Sidings and Depot Sidings (as defined by the TfL Management System Glossary). This...
This document references:
S1622 - Glossary of Terms and Abbreviations
Published by LUL
on
July 1, 2016
This Standard applies to all Category 1, 2 and 5 Standards and the Railway Safety Case (and successor documents). It applies to technical and financial documents where applicable and communications...
This document is referenced by:
T0433 - Conductor Rail Arc Welding
Published by LUL
on
April 1, 2022
This specification applies to steel conductor rails and steel conductor rail ramps using the arc-welding process on site. It does not apply to composite conductor rail. This specification applies to...
This document is referenced by:
S1158 - Track – Inspection and Maintenance
Published by LUL
on
August 1, 2023
This standard applies to the Permanent Way system in running lines, depots and sidings. It covers, but is not limited to, the following components of track: a) running rails b) check rails c) rail...
This document is referenced by:
S1055 - Civil Engineering – Deep Tube Tunnels and Shafts
Published by LUL
on
December 1, 2022
This standard applies to Deep Tube Tunnel assets owned by or being constructed for LU. This Standard applies to any party undertaking works to provide new, alter existing, undertaking maintenance or...
This document is referenced by:
T0435 - Track: Manufacture, assembly and handling of junctionwork
Published by LUL
on
November 1, 2019
This specification applies to the manufacture and dispatch of new P&C for use in LU-controlled infrastructure. It also applies to trial or test panel assemblies where these are required by the...