This document references:
S1164 - Conductor rail – Conditions and Maximum permitted values
Published by LUL
on
September 1, 2021
This standard applies to all track including, plain line and junctionwork in open, sub-surface and tube sections and in depots. This standard applies to all approved conductor rail types and...
This document references:
G3212 - Composite conductor rail installation and maintenance
Published by LUL
on
March 1, 2016
The scope of this Track Handbook is to provide guidance for the methods and tools to be used when working with CCR. It covers the installation of CCR, its insulator supports, ramps, anchors, slipper...
This document references:
S1164 - Conductor rail – Conditions and Maximum permitted values
Published by LUL
on
September 1, 2021
This standard applies to all track including, plain line and junctionwork in open, sub-surface and tube sections and in depots. This standard applies to all approved conductor rail types and...
This document references:
S1168 - Track Asset Walkways
Published by LUL
on
August 1, 2020
This standard applies to the following: a) All track asset walkways. b) Locations where trains are stabled at Sidings and Depot Sidings (as defined by the TfL Management System Glossary). This...
This document references:
T0403 - Wood Sleepers, Bearers, Pitblocks and Slipper Runs
Published by LUL
on
April 1, 2023
This specification applies methods of preservation and finishing, dimensional tolerances, the characteristics and defects permitted in the finished product and the minimum requirements for quality...
This document references:
T0406 - Track: Conductor rail and associated components
Published by LUL
on
September 1, 2023
This specification applies to conductor rail (both steel and other materials) and the following associated components: a) ramps b) fishplates c) anchors and anchor struts d) insulators, caps, clips...
This document is referenced by:
S1163 - Conductor rail – Inspection and Maintenance
Published by LUL
on
May 1, 2021
This standard applies to all conductor rail systems in plain line and junctionwork: The requirements of this standard are applicable to all approved systems of conductor rail. This standard does not...
This document is referenced by:
G1413 - Planning new lines and extensions to existing lines
Published by LUL
on
August 1, 2021
This guidance should be used by developers, local authorities, consultants, other third party promoters and Transport for London (TfL) and London Underground (LU) staff. It covers the planning...