NR/L3/OPS/084 ISSUE 4

Line Clear Arrangements Following Engineering Works in Axle Counter Areas – Line Clear Verification Process (formerly NR/L3/OCS/084)

inactive
Organization: NR
Publication Date: 1 September 2018
Status: inactive
Page Count: 26
scope:

This document defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved by axle counters, unless safety validation determines that an LCV process is not required.

The LCV process may additionally be employed in non-axle counter areas where a line clear procedure over and above that set out in GE/RT8000 or NR/OPS/NOI is deemed beneficial. Examples may include complex possessions or a series of possessions involving multiple vehicles entering or leaving the possession.

This document is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied.

Purpose

This document describes the Line Clear Verification Process (LCV) process. The LCV process is able to support the safe interim and final handback of a possession by providing a means of assessing that the line is clear in addition to conventional line clear procedures (as defined in GE/RT8000 or NR/OPS/NOI.

The LCV process is based on the principle of a diverse means of proving the line clear and safe following engineering works and is designed to align as closely as possible with established methods of working.

Document History

December 4, 2021
Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process
This work instruction defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved...
March 7, 2020
Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process
This work instruction defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved...
NR/L3/OPS/084 ISSUE 4
September 1, 2018
Line Clear Arrangements Following Engineering Works in Axle Counter Areas – Line Clear Verification Process (formerly NR/L3/OCS/084)
This document defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved by axle...
December 3, 2011
Line Clear Arrangements following Engineering Works in Axle Counter areas - Line Clear Verification Process
This standard is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied. The areas where axle counters are the primary means of train...
September 3, 2011
Line Clear Arrangements Following Engineering Works in Axle Counter areas - Line Clear Verification Process (aka NR/L3/OPS/084)
This standard is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied. The areas where axle counters are the primary means of train...
March 6, 2010
Line Clear Arrangements following Engineering Works - Line Clear Verification Process (including Engineering Examination) (aka NR/L3/OPS/084)
This standard is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied. The areas where the LCV process is applicable shall be...