NR/L3/SIG/30084 ISSUE 1

Line Clear Arrangements following Engineering Works - Line Clear Verification Process (including Engineering Examination) (aka NR/L3/OPS/084)

inactive
Organization: NR
Publication Date: 6 March 2010
Status: inactive
Page Count: 43
scope:

This standard is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied.

The areas where the LCV process is applicable shall be identified in the Sectional Appendix.

Axle counter areas where Engineer's Possession Reminder (EPR) is available shall require the application of the LCV process unless an alternative, approved enhanced line clear process is available.

NOTE Where an EPR facility is available it should be expected to be used for any axle counter sections subject to pre-planned work under Modules T2 or T3 of the Rule Book.

Where the LCV process is to be used, this shall be indicated in published arrangements as described in sections 6.1.4 and 6.1.46.1.5.

Any proposal to apply the LCV process to any areas shall require:

• provision of an operational readiness report confirming that the necessary resources and briefing/training is complete;

• provision of an implementation plan confirming any trial operation or staging and that a suitable mentoring/monitoring plan is in place;

• confirmation, supported by evidence, that all safety requirements can be met (primarily by compliance with all sections of this standard).

Purpose

This standard defines the requirements for the application of the LCV process on Network Rail infrastructure. Whilst developed for lines with mixed traffic including high speed trains, and primarily aimed at axle counter areas utilising unconditional engineering reset, it is capable of application to any area authorised by Network Rail.

The LCV process is based on the principle of a diverse means of proving the line clear and safe following engineering works and is designed to align as closely as possible with established methods of working.

Where relied on as the enhanced line clear process in axle counter areas, the requirements of this standard shall be complied with in all respects.

Document History

December 4, 2021
Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process
This work instruction defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved...
March 7, 2020
Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process
This work instruction defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved...
September 1, 2018
Line Clear Arrangements Following Engineering Works in Axle Counter Areas – Line Clear Verification Process (formerly NR/L3/OCS/084)
This document defines the requirements for the application of the LCV process on axle counter areas on Network Rail infrastructure and applies to all lines where train detection is achieved by axle...
December 3, 2011
Line Clear Arrangements following Engineering Works in Axle Counter areas - Line Clear Verification Process
This standard is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied. The areas where axle counters are the primary means of train...
September 3, 2011
Line Clear Arrangements Following Engineering Works in Axle Counter areas - Line Clear Verification Process (aka NR/L3/OPS/084)
This standard is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied. The areas where axle counters are the primary means of train...
NR/L3/SIG/30084 ISSUE 1
March 6, 2010
Line Clear Arrangements following Engineering Works - Line Clear Verification Process (including Engineering Examination) (aka NR/L3/OPS/084)
This standard is applicable to those involved with planning or implementing any engineering works where the LCV process is to be applied. The areas where the LCV process is applicable shall be...

References

Advertisement