NR/L3/CIV/006/1A ISSUE 3

Handbook for the Examination of Structures Part 1A: Purpose, Scope and Definitions

inactive
Organization: NR
Publication Date: 5 June 2010
Status: inactive
Page Count: 41
scope:

This handbook applies to Network Rail owned or managed Structures, Outside Party Structures and Shared Structures.

This handbook does not apply to:

1. reservoirs that can retain greater than 25,000 cubic metres of water, and which are examined in accordance with the Reservoir Act (1975);

2. Undertrack Crossings.

A management strategy for a Major Structure should adhere to the principles of this handbook.

This handbook shall apply to Structures within freight depots when an examination is specifically required by the Structure Manager.

Health and safety requirements applicable to operational and occupational safety and emergency evacuation requirements are outside the scope of this handbook.

This handbook does not define the organisational and commercial responsibilities for delivering the requirements and recommendations of this handbook.

Purpose

The purpose of this handbook is to define the requirements and provide recommendations for:

• examination of Structures;

• recording and reporting the findings of an examination;

• identifying actions and remedial works that need to be undertaken so that there is no unacceptable risk to the safety or performance of a Structure as a result of its condition.

This handbook contains requirements supplementary to those given in NR/L1/CIV/032: Managing existing Structures1.

1 This provides information on managing structures for all Structure Categories.

Document History

March 4, 2023
Structures, Tunnels and Operational Property Examinations: Management of Examinations
This module applies to assets managed in accordance with the structures management framework in NR/L2/CIV/032.  The examination regimes included in this module can also be applied to ancillary...
September 7, 2019
Structures, Tunnels and Operational Property Examinations: Management of Examinations
This module applies to the following Category A, B, C, & F assets as defined in NR/L1/CIV/032. Category G Assets unless identified as Operational Property assets in NR/L3/CIV/006. This module does...
NR/L3/CIV/006/1A ISSUE 3
June 5, 2010
Handbook for the Examination of Structures Part 1A: Purpose, Scope and Definitions
This handbook applies to Network Rail owned or managed Structures, Outside Party Structures and Shared Structures. This handbook does not apply to: 1. reservoirs that can retain greater than 25,000...

References

Advertisement