NR/L3/SIG/10665 ISSUE 2
Reliability Centred Maintenance of Signalling Equipment (ROSE)
| Organization: | NR |
| Publication Date: | 6 March 2010 |
| Status: | inactive |
| Page Count: | 81 |
scope:
This Level 3 document applies to all staff who undertake preventative or corrective maintenance to signalling assets affected by the ROSE project on Network Rail infrastructure.
Purpose
This Level 3 document contains the Network Rail ROSE Signal Maintenance Specifications (NR/ROSE) that have been produced as an alternative to the default maintenance regime for Signalling assets on Network Rail infrastructure (NR/L2/SIG/10660 & NR/L2/SIG/10663).
Document History