scope:
This Level 3 document applies to all staff who undertake preventative or corrective maintenance to signalling assets affected by the ROSE project on Network Rail infrastructure.
Purpose
This Level 3 document contains the Network Rail ROSE Signal Maintenance Specifications (NR/ROSE) that have been produced as an alternative to the default maintenance regime for Signalling assets on Network Rail infrastructure (NR/L2/SIG/10660 and NR/L2/SIG/10663).