NR/L3/SIG/10665 ISSUE 15
Reliability Centred Maintenance of Signalling Equipment (ROSE)
| Organization: | NR |
| Publication Date: | 3 March 2018 |
| Status: | inactive |
| Page Count: | 43 |
scope:
This document covers the conditions required to allow the transition from the default maintenance regime to a Reliability-Centred Maintenance regime for signalling equipment.
This document applies to:
a) Section Managers (Signals);
b) Signal & Telecoms Maintenance Engineers;
c) Route Asset Managers (Signals).
Purpose
This document contains the prerequisites, allowing Reliability-Centred Maintenance to be implemented on signalling equipment as an alternative to the default maintenance regime.
Document History