NR/SIG/10665 ISSUE 12
Reliability Centred Maintenance of Signalling Equipment (RoSE)
| Organization: | NR |
| Publication Date: | 12 September 2014 |
| Status: | inactive |
| Page Count: | 12 |
scope:
This document applies to all staff who undertake preventative or corrective maintenance to signalling assets affected by the RBM Programme which has incorporated those of the ROSE project on Network Rail Infrastructure
Purpose: This document contains the Network Rail ROSE Signal Maintenance Specifications (NR/ROSE) that have been produced as an alternative to the default maintenance regime for Signalling assets on Network Rail infrastructure.
Document History