This document references:
NR/L1/TEL/30029 - Telecoms Installation
Published by NR
on
March 6, 2010
This Company Standard is mandatory and shall be applied by Network Rail staff and contractors to all installation work of telecommunications equipment or systems on Network Rail Controlled...
This document references:
NR/L1/TEL/30092 - Telecoms Testing and Commissioning Procedure
Published by NR
on
December 3, 2016
This procedure applies to Network Rail and its contractors involved in the telecoms testing and commissioning process. This procedure applies to: a) new / renewed equipment/systems; and b) modified...
This document references:
NR/L1/TEL/30029 - Telecoms Installation
Published by NR
on
March 6, 2010
This Company Standard is mandatory and shall be applied by Network Rail staff and contractors to all installation work of telecommunications equipment or systems on Network Rail Controlled...
This document references:
NR/L1/TEL/30100 - Telecoms Design
Published by NR
on
March 6, 2010
This Company Standard is mandatory on Network Rail and its contractors involved in the design of all: 1. Operational telecoms equipment/systems; 2. Retail telecoms equipment/systems; 3. Cable or...
This document references:
NR/L2/SIG/30017 - Requirements for Level Crossings
Published by NR
on
September 3, 2011
The requirements of Modules D to L inclusive apply to alterations (as defined below) to existing level crossings and for new level crossings subject to any project specific deviations already agreed...
This document references:
NR/L1/TEL/30092 - Telecoms Testing and Commissioning Procedure
Published by NR
on
December 3, 2016
This procedure applies to Network Rail and its contractors involved in the telecoms testing and commissioning process. This procedure applies to: a) new / renewed equipment/systems; and b) modified...