RT/D/P/020 ISSUE 6
Title:
Management of RTIA, IMC2 & IMC2000 Asset Change Proposals
Organization: NR
Year: 2000
Status: Inactive
RT/D/P/034 ISSUE 4
Title:
Delegation & Use of Contractual Powers - RT1A, IMCZ & IMC2000
Organization: NR
Year: 2000
Status: Inactive
RT/E/P/10175 ISSUE 15
Title:
Process for Management of TPWS Technical Instructions and Guidance Notes
Organization: NR
Year: 2004
Status: Inactive
RT/E/S/21060 ISSUE 1
Title:
Issue of Safety Documentation for Work on 650/750 V DC Apparatus
Organization: NR
Year: 1998
Status: Inactive
NR/L2/SIG/30014/D115/DT3-31 ISSUE 1
Title:
Defined Function Test - Relay Through Circuit Test
Organization: NR
Year: 2011
Status: Inactive
NR/L2/SIG/30014/D115/DT2-31 ISSUE 1
Title:
Defined Technical verification Test - Inspection to Signal / Signage Sighting Form
Organization: NR
Year: 2011
Status: Inactive
NR/L2/SIG/30014/D115/DT3-71 ISSUE 1
Title:
Defined Function Test - Integration Test
Organization: NR
Year: 2011
Status: Inactive
NR/L2/SIG/30014/D115/DT3-41 ISSUE 1
Title:
Defined Function Test - Signal Beam Alignment Test
Organization: NR
Year: 2011
Status: Inactive
NR/L2/SIG/19608 ISSUE 6
Title:
Level Crossing Infrastructure: Inspection & Maintenance
Organization: NR
Year: 2011
Status: Inactive
RT/E/PS/11756 ISSUE 1
Title:
HVI Track Circuits (aka NR/PS/SIG/11756)
Organization: NR
Year: 2000
Status: Inactive
NR/GN/INI/002 ISSUE 1
Title:
Network Rail Health & Safety Management System - Infrastructure Investment Accountabilities and Responsibilities
Organization: NR
Year: 2009
Status: Inactive
RT/E/S/40015 ISSUE 2
Title:
Core Maintenance Specification for Gas & Oil Fired Heating Systems in Depots & Stations
Organization: NR
Year: 2000
Status: Inactive
NR/L3/INI/TK0042 ISSUE 2
Title:
Use of Atws to Protect an Adjacent Open Line when Working with on Track Plant (OTP) and other Machines
Organization: NR
Year: 2008
Status: Inactive
NR/L3/INI/CP0078 ISSUE 1
Title:
Working on or Adjacent to the Conductor Rail
Organization: NR
Year: 2011
Status: Inactive
NR/L3/INI/CI0035 ISSUE 3
Title:
Civils Health & Safety File Control Process
Organization: NR
Year: 2008
Status: Inactive
NR/L3/MPI/TK0052 ISSUE 2
Title:
Standard Project Procedure - Freight Haulier Claims
Organization: NR
Year: 2007
Status: Inactive
RT/D/P/047 ISSUE 6
Title:
Management of Infrastructure Maintenance Contract Regimes
Organization: NR
Year: 2000
Status: Inactive
RT/D/P/027 ISSUE 5
Title:
Infrastructure Maintenance Contracts Changes to Contract Lump Sums, Prices, Targets and Fees
Organization: NR
Year: 2000
Status: Inactive
NR/PRC/MPI/CI0058 ISSUE 1
Title:
Controlling the Risk of Earthwork Instability During Mp&I Civils Excavation Works
Organization: NR
Year: 2007
Status: Inactive
NR/PRC/MPI/TK0054 ISSUE 1
Title:
Risk
Organization: NR
Year: 2007
Status: Inactive
NR/SIN/107 ISSUE 1
Title:
Fixed Stretcher Bar Remedial Works - in Addition to the Requirements of SIN104 & NR/L3/TRK/1202
Organization: NR
Year: 2010
Status: Inactive
NR/SIN/111-AFSR-LEVER MOD ISSUE 1
Title:
Lever Arm Modification - AF Single Rod Neutral Section
Organization: NR
Year: 2010
Status: Inactive
NR/SP/RSC/00601 ISSUE 3
Title:
Executive Safety, Health & Environment (SHE) Meetings: Structure & Processes
Organization: NR
Year: 2006
Status: Inactive
NR/SIN/110 ISSUE 2
Title:
Installation of Hard-Lock Fastenings on Adjustable Stretcher Bars
Organization: NR
Year: 2011
Status: Inactive
ATC/T/136 ISSUE 1
Title:
Arrangement of A.T.C Test Inductors for Running Sheds
Organization: NR
Status: Active
ATC/T/462 ISSUE 1
Title:
AWS Track Inductor Ramp General Assembly
Organization: NR
Status: Active
ATC/T/898 ISSUE C
Title:
Arrangement of Track & Electro Permanent Electro Inductors, Extra Strength Suppressor & Ramp on Concrete
Organization: NR
Year: 1988
Status: Active
ATC/T/900 ISSUE C
Title:
B.R. Automatic Warning System Track Inductor Ramp New Pattern General Assembly
Organization: NR
Year: 1996
Status: Active
ATC/T/904 ISSUE E
Title:
B.R Automatic Warning System Track Inductor Ramp Extension
Organization: NR
Year: 1996
Status: Active
ATC/T/903 ISSUE B
Title:
BR Automatic Warning System Double Fixing Plate for Extra Strength Suppressor Indicators Fitted to Concrete Sleepers
Organization: NR
Year: 1996
Status: Active
ATC/T/901 ISSUE A
Title:
BR Automatic Warning System Seating Pads, Rubber for Inductor & Ramp Fixing Plates
Organization: NR
Year: 1988
Status: Active
ATC/T/899 ISSUE B
Title:
BR Automatic Warning System Packing Plates For Inductors And Ramp
Organization: NR
Year: 1996
Status: Active
ATC/T/896 ISSUE B
Title:
BR Automatic Warning System Standard Fixing Plate for Ramp to Concrete Sleepers
Organization: NR
Year: 1996
Status: Active
ATC/T/895 ISSUE B
Title:
BR Automatic Warning System Standard Double Fixing Plate for Inductors Fitted to Concrete Sleepers
Organization: NR
Year: 1996
Status: Active
ATC/T/889 ISSUE B
Title:
BR Automatic Warning System Standard Single Fixing Plate for Inductors & Ramp Fitted to Concrete Sleepers
Organization: NR
Year: 1996
Status: Active
ATC/T/886 ISSUE A
Title:
BR.Automatic Warning System Track Inductor Ramp (New Pattern) Details
Organization: NR
Year: 1998
Status: Active
ATC/T/482
Title:
BR-A.W.S Typical Arrangement of Track Equipment Fitted on Concrete Sleepers
Organization: NR
Status: Active
ATC/T/905 ISSUE A
Title:
BR Automatic Warning System Method of Fixing Track Inductor Ramp Extension
Organization: NR
Year: 1985
Status: Active
ATC/T/463 ISSUE 1
Title:
Arrangement of Track Inductor & Ramp on Timber Sleepers
Organization: NR
Status: Active
ATC/T/464 ISSUE 1
Title:
Arrangement of Track Inductor & Ramp on Concrete Sleepers
Organization: NR
Status: Active
COP0024 ISSUE 2
Title:
Use & Loading of MEWPs
Organization: NR
Year: 2010
Status: Inactive
NR/L2/EBM/STP001/01 ISSUE 5
Title:
Principles of Standards Management
Organization: NR
Year: 2011
Status: Inactive
NR/CIV/SD/205 ISSUE D
Title:
Retaining Walls: Sheet Pile Capping Beam
Organization: NR
Year: 2012
Status: Active
NR/L2/SIG/30014/D115/DT5-01 ISSUE 2
Title:
Signal Works Defined Changeover Technique - Testing LED Changeover
Organization: NR
Year: 2012
Status: Inactive
NR/L2/SIG/30014/D115/DT5-02 ISSUE 2
Title:
Signal Works Defined Changeover Technique - Construction LED Changeover
Organization: NR
Year: 2012
Status: Inactive
NR/L3/TRK/3102 ISSUE 1
Title:
Topographic, Engineering, Land and Measured Building Surveying - Civils Surveying
Organization: NR
Year: 2010
Status: Pending
NR/L3/TRK/3106 ISSUE 1
Title:
Topographic, Engineering, Land and Measured Building Surveying - Commercial Property Surveying Standard
Organization: NR
Year: 2010
Status: Pending
RT/D/P/030 ISSUE 8
Title:
RT1A, IMC2 & IMC2000 Payment Cost Control and Reporting
Organization: NR
Year: 2002
Status: Inactive
BUSINESS PROCESS 5400 ISSUE 1
Title:
Level Crossings - Asset Inspection and Implementation of Minimum Action Codes
Organization: NR
Year: 2013
Status: Inactive
NR/L2/SIG/30014/C120/TP01 ISSUE 2
Title:
Signalling Works Testing Handbook: Test Plan Form
Organization: NR
Year: 2014
Status: Inactive
NR/L2/SIG/30014/C120/TP02 ISSUE 2
Title:
Signalling Works Testing Handbook: Test Plan Appendix A - Index of Appendices form
Organization: NR
Year: 2014
Status: Inactive
NR/L3/SIGELP/50001/SPS S003 ISSUE 1
Title:
Working on or Near 650V Signalling Power Supplies - Dead Working Procedure
Organization: NR
Year: 2015
Status: Inactive
NR/L3/SIGELP/50001/SPS S004 ISSUE 1
Title:
Working on or Near 650V Signalling Power Supplies - Safe Access to Equipment Housings
Organization: NR
Year: 2015
Status: Inactive
NR/L3/SIGELP/50001/SPS T005 ISSUE 1
Title:
Working on or Near 650V Signalling Power Supplies - Insulation Monitor End of Feeder Test
Organization: NR
Year: 2015
Status: Inactive
NR/L3/SIGELP/50001/SPS S001 ISSUE 1
Title:
Working on or Near 650V Signalling Power Supplies - Planning of Work on or Near Signalling Power Supplies above 175V
Organization: NR
Year: 2015
Status: Inactive
NR/L3/SIGELP/50001/SPS S002 ISSUE 1
Title:
Working on or Near 650V Signalling Power Supplies - Authority to Work Live (Proforma)
Organization: NR
Year: 2015
Status: Inactive
SSIDIS146 ISSUE 7
Title:
Simple Application of Two and Three Aspect LED Banner Repaters
Organization: NR
Year: 2013
Status: Inactive
NR/CIV/SD/CALCS/682 ISSUE P1
Title:
Infilling of Disused Arch Under-bridges: Calculations and Assumptions
Organization: NR
Year: 2016
Status: Active
NR/L3/MTC/MG0221/BRIEFING ISSUE 1
Title:
Technical Briefing: NR/L3/MTC/MG0221 issue 4: Network Operations non-operations staff management self assurance procedure; SMF/MG/443 Issue 7: Management self-assurance question sets
Organization: NR
Year: 2016
Status: Inactive
NR/L2/SIG/30014/D115/DT3-13 ISSUE 3
Title:
Signalling Works Testing Handbook (NR/SWTH): Defined Function Test - Strap and Function Test
Organization: NR
Year: 2016
Status: Inactive
NR/L2/SIG/30014/D115/DT3-12 ISSUE 3
Title:
Signalling Works Testing Handbook (NR/SWTH): Defined Function Test - Circuit Function Test
Organization: NR
Year: 2016
Status: Inactive
NR/L2/SIGELP/50000/BRIEFING ISSUE 1
Title:
Safe Working and Maintenance on or near Signalling Power Distribution Equipment above 175 V - Briefing
Organization: NR
Year: 2016
Status: Inactive
NR/L3/SIGELP/50001/BRIEFING ISSUE 1
Title:
Signalling Power Distribution Equipment above 175 V (Work Instructions) - Briefing
Organization: NR
Year: 2016
Status: Inactive
NR/L3/INF/02226/SCHEDULES ISSUE 3
Title:
Corporate Records Retention Schedules
Organization: NR
Year: 2017
Status: Inactive
NR/CIV/SD/262 ISSUE E
Title:
Ballast/Cess Support Structures: Unanchored Driven Tubular Pile, Panel Type
Organization: NR
Year: 2017
Status: Active
NR/L3/INI/P3M/131 ISSUE 1
Title:
Document Management Manual
Organization: NR
Year: 2018
Status: Inactive
TWI 2P034 ISSUE 1
Title:
How to Change a Steel Sleeper
Organization: NR
Year: 2005
Status: Inactive
TWI 3G064 ISSUE 1
Title:
How to Relay with Steel Sleepers
Organization: NR
Year: 2005
Status: Inactive
NR/L2/SIG/11201/MOD A3-10 ISSUE 1
Title:
Signalling Design Handbook: Signalling Scheme Plans Best Practice
Organization: NR
Year: 2018
Status: Active
NR/SIN/155 ISSUE 2
Title:
Warning Signs for A.C & D.C. Switching Stations
Organization: NR
Year: 2018
Status: Inactive
NR/L3/ELP/27240/NR/DIST INDEX ISSUE 8
Title:
Distribution Equipment Work Instructions Index
Organization: NR
Year: 2019
Status: Inactive
NR/L3/ELP/27240/NR/DIST C03I ISSUE 1
Title:
Maintenance of ABB ZX1.5R Switchgear
Organization: NR
Year: 2016
Status: Active
NR/L3/ELP/27240/NR/DIST C03J ISSUE 1
Title:
Maintenance of Siemens ASG 25 Switchgear
Organization: NR
Year: 2017
Status: Active
NR/L3/ELP/27240/NR/DIST C03P ISSUE 1
Title:
Maintenance of Areva CBR25 Structure Mounted Outdoor Switchgear
Organization: NR
Year: 2017
Status: Active
NR/L3/ELP/27240/NR/DIST C03S ISSUE 1
Title:
Routine Maintenance of Areva 25kV WI SF6 Switchgear
Organization: NR
Year: 2017
Status: Active
NR/L3/ELP/27240/NR/DIST C03T ISSUE 1
Title:
Routine Maintenance of Balfour Beatty TAC1 25kV AIS Switchgear
Organization: NR
Year: 2017
Status: Active
SPM 57 ISSUE 2
Title:
Particular Specification - Closed Circuit Television Camera Columns for the Director of Signals and Telecommunications
Organization: NR
Year: 1991
Status: Inactive
BR 1690 ISSUE 1.1
Title:
Keyboard Send and Receive Only Teleprinter Terminals
Organization: NR
Year: 1991
Status: Inactive
BR 876A ISSUE 1
Title:
Specification for Polythene Insulated and PVC Sheathed Interruption Cable for Railway Telecommunications
Organization: NR
Year: 1974
Status: Inactive
BR 861 ISSUE 1
Title:
Specification for Commissioning and Acceptance Tests of Air Pressure Systems for Telecommunications Cables
Organization: NR
Year: 1976
Status: Inactive
BR 873 ISSUE 1
Title:
Specification for Multi-Pair, Straight Twin Air Spaced, Paper Insulated, Lead Alloy and Polythene Sheathed Cables for Railway Telecommunications
Organization: NR
Year: 1971
Status: Inactive
BR 875 ISSUE 1
Title:
Specification for Multi-Pair, Multiple Twin Air Spaced, Paper Insulated, Lead Alloy Sheathed and Polythene Sheathed Cables for Railway Telecommunications
Organization: NR
Year: 1971
Status: Inactive
BR 842 ISSUE 1
Title:
Single and Multi-Entry Shrink Joint Closures for Polyethylene Sheathed Telecommunications Cables
Organization: NR
Year: 1986
Status: Inactive
BR 851 ISSUE 1
Title:
Heat Shrink Wrap-around Joint Closure for Polyethylene Sheathed Telecommunications Cables
Organization: NR
Year: 1986
Status: Inactive
BGEN0067 ISSUE 3
Title:
Telecommunications Fault Control (TFC) Operational Procedures
Organization: NR
Year: 1990
Status: Inactive
BR 864 ISSUE 1
Title:
Specification for Twin Type Polyethylene Insulated Compound Filled and Polyethylene Sheathed Cable with Integral Suspension Wire for Railway Telecommunications
Organization: NR
Year: 1977
Status: Inactive
BR 819 ISSUE 3
Title:
Earthing and Bonding of Telecommunications Cable Sheaths Separate Screening Conductors and Associate Lineside Equipment in AC Electrified Areas
Organization: NR
Year: 1995
Status: Inactive
BR 878A ISSUE 1
Title:
Specification for Polythene Insulated and PVC Sheathed Interruption Cable for Railway Telecommunications
Organization: NR
Year: 1974
Status: Inactive
BR 3007 ISSUE 2
Title:
Standard Maintenance Conditions for BR Maintained Telecommunications Equipment
Organization: NR
Year: 1991
Status: Inactive
BR 1693 ISSUE 1.1
Title:
Automatic Send and Receive Teleprinter
Organization: NR
Year: 1991
Status: Inactive
BR 885 ISSUE 1
Title:
Specification for PVC Insulated Quad, 0.63mm and 0.9mm Diameter Copper Conductors, Lead Alloy Sheathed Cable and PVC Protected Cable for Telecommunications (Metric Units)
Organization: NR
Year: 1975
Status: Inactive
BR 860 ISSUE 1
Title:
Specification for Installation of Air Pressure Systems for Telecommunications Cables Employing Contact Pressure Gauges and/or Pressurised Cable Contactors
Organization: NR
Year: 1975
Status: Inactive
BR 1915 ISSUE 0.1
Title:
Functional Specification for Special Telephone To Access Locomotive Radios on the BR National Radio Network
Organization: NR
Year: 1988
Status: Inactive
BR 1641 ISSUE 3
Title:
Telephone Operators Directory Systems
Organization: NR
Year: 1991
Status: Inactive
BR 874 ISSUE 1
Title:
Specification for Multi-Pair, Multiple Twin Air Spaced, Paper Insulated, Lead Alloy Sheathed and Polythene Sheathed Cables for Railway Telecommunications
Organization: NR
Year: 2019
Status: Inactive
NR/CIV/SD/1210 ISSUE E
Title:
Z-Type Underbridges: Steelwork General Assembly Details: Notes
Organization: NR
Year: 2020
Status: Active
NR/L2/ELP/27551 ISSUE 1
Title:
TPCMS Change Management Process
Organization: NR
Year: 2020
Status: Active
NR/L3/MTC/RCS0216/GH04 ISSUE 8
Title:
Risk Control Manual: Working at Height
Organization: NR
Year: 2020
Status: Active
NR/CIV/SD/452 ISSUE A
Title:
Non-Canopy Station Footbridges: Main Span - Stepped Deck - Indicative Lighting Details
Organization: NR
Year: 2020
Status: Active
NR/CIV/SD/453 ISSUE A
Title:
Non-Canopy Station Footbridges: Main Span - Flat Deck - Indicative Lighting Details
Organization: NR
Year: 2020
Status: Active
NR/CIV/SD/454 ISSUE A
Title:
Non-Canopy Station Footbridges: CHS Support - Indicative Cabling Containment Route
Organization: NR
Year: 2020
Status: Active
NR/CIV/SD/455 ISSUE A
Title:
Non-Canopy Station Footbridges: Trestle Support - Indicative Cabling Containment Route
Organization: NR
Year: 2020
Status: Active
NR/CIV/SD/456 ISSUE A
Title:
Non-Canopy Station Footbridges: CHS and Trestle Supports - Cabling Containment Fixing Details
Organization: NR
Year: 2020
Status: Active
NR/CIV/SD/457 ISSUE A
Title:
Non-Canopy Station Footbridges: Main Span - Service Duct Route - Through U-Frames
Organization: NR
Year: 2020
Status: Active
NR/L1/ELP/27000 ISSUE 4
Title:
Policy Requirements for Electrical Power Assets
Organization: NR
Year: 2021
Status: Active
NR/L2/P3M/223 ISSUE 1
Title:
Project Acceleration in a Controlled Environment (PACE) - Manage Cost and Commercial
Organization: NR
Year: 2021
Status: Inactive
NR/L2/P3M/223/MOD01 ISSUE 1
Title:
Project Acceleration in a Controlled Environment (PACE) - Manage Cost Planning
Organization: NR
Year: 2021
Status: Inactive
NR/L2/P3M/223/MOD02 ISSUE 1
Title:
Project Acceleration in a Controlled Environment (PACE) - Commercial Process and Cost Management
Organization: NR
Year: 2021
Status: Inactive
NR/L2/P3M/226 ISSUE 1
Title:
Project Acceleration in a Controlled Environment (PACE) - Manage Stakeholders
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/0064 ISSUE 6
Title:
Delivering Work within Possessions (aka NR/L3/INI/CP0064)
Organization: NR
Year: 2021
Status: Active
NR/L3/P3M/131 ISSUE 3
Title:
Document Management Manual (aka NR/L3/INI/P3M/131)
Organization: NR
Year: 2021
Status: Active
NR/L3/P3M/131/MOD01 ISSUE 2
Title:
Document Management Manual: Document Management Procedure
Organization: NR
Year: 2021
Status: Active
NR/L3/P3M/131/MOD02 ISSUE 2
Title:
Document Management Manual: Document Referencing
Organization: NR
Year: 2021
Status: Active
NR/SIN/190 ISSUE 2
Title:
Electronic Boundary Inspection (End to End)
Organization: NR
Year: 2020
Status: Inactive
NR/SIN/192 ISSUE 2
Title:
Dorman Phantom Aspect Mitigation
Organization: NR
Year: 2020
Status: Inactive
NR/SIN/199 ISSUE 1
Title:
Safety of Machinery in Network Rail Owned and Operated Depots and Facilities
Organization: NR
Year: 2021
Status: Active
NR/GN/CIV/065 ISSUE 1
Title:
Examination of Earthworks Guidance Manual
Organization: NR
Year: 2021
Status: Inactive
NR/L2/CTM/220 ISSUE 2
Title:
Competence & Training in Portable, Transportable & Mobile Plant (PTMP) Operation & Activities
Organization: NR
Year: 2021
Status: Active
NR/L2/ENV/015 ISSUE 9
Title:
Environment and Social Minimum Requirements for Projects - Design and Construction
Organization: NR
Year: 2021
Status: Active
NR/L2/ENV/124 ISSUE 1
Title:
Managing Diesel Engine Exhaust Emissions within Stations and Depots
Organization: NR
Year: 2021
Status: Active
NR/L2/OPS/250 ISSUE 8
Title:
Network Rail National Emergency Plan
Organization: NR
Year: 2021
Status: Active
NR/L2/OPS/292 ISSUE 1
Title:
Station Capacity and Crowd Management Business Process
Organization: NR
Year: 2021
Status: Active
NR/L2/RMVP/0172 ISSUE 3
Title:
Management of the Control and Calibration of Inspection, Measuring and Test Equipment
Organization: NR
Year: 2021
Status: Active
NR/L2/TEL/30176 ISSUE 1
Title:
Telecoms Asset Data Requirements
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250 ISSUE 1
Title:
National Emergency Plan Index
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/0077 ISSUE 2
Title:
Signalling Pre-Commissioning Readiness Requirements (aka NR/L3/INI/CP077)
Organization: NR
Year: 2021
Status: Active
NR/GN/CIV/065/MOD01 ISSUE 1
Title:
Examination of Earthworks Guidance Manual: Soil Cuttings
Organization: NR
Year: 2021
Status: Active
NR/GN/CIV/065/MOD02 ISSUE 1
Title:
Examination of Earthworks Guidance Manual: Soil Embankments
Organization: NR
Year: 2021
Status: Active
NR/GN/CIV/200/12 ISSUE 1
Title:
Station Design Manual: Third Party Funded Railway Car Parks
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/086/MOD14 ISSUE 1
Title:
Management of Earthworks: Asbestos Risk Assessment for Earthwork Interventions
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11201/MOD B1 ISSUE 6
Title:
Signalling Design Handbook: General Introduction
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11201/MOD B2 ISSUE 6
Title:
Signalling Design Handbook: Safety Hazards
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11201/MOD B21 ISSUE 1
Title:
Signalling Design Handbook: Legacy and Specialised Equipment Engineering for Lever Frame and Traditional Signal Boxes
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/E04 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Signal Structures
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/F02 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Solar Photovoltaic (PV) Modules for Off-Grid Power Supply Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/F03 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Wind Turbine Generators for Off-Grid Power Supply Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/F04 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Fuel Cells for Off-Grid Power Supply Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/F05 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Batteries for Off-Grid Power Supply Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/F06 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Solar Charge Controllers for Off-Grid Power Supply Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS5-61 ISSUE 1
Title:
Signalling Works Testing: Thales AzLM Axle Counter ISDN / Ethernet Converter (CIE) Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS5-64 ISSUE 1
Title:
Signalling Works Testing: Thales AzLM Axle Counter ISDN / V.24 Converter Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS5-11 ISSUE 5
Title:
Signalling Works Testing: EBI Track 200 Track Circuit Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS5-69 ISSUE 1
Title:
Signalling Works Testing: Frauscher FAdC R1 & R2 Axle Counter Data Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS6-21 ISSUE 4
Title:
Signalling Works Testing: Point Machine Signalling Works Testing Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS6-31 ISSUE 6
Title:
Signalling Works Testing: Rail Clamp Point Lock (RCPL) Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS6-35 ISSUE 5
Title:
Signalling Works Testing: In Bearer Clamp Lock (IBCL) Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS6-41 ISSUE 1
Title:
Signalling Works Testing: Mk2 Rail Clamp Point Lock (RCPL) Wide to Gauge (WTG) Trap Points Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS12-01 ISSUE 2
Title:
Signalling Works Testing: SSI Central Interlocking Signalling Works Test Specification
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS14-41 ISSUE 1
Title:
Signalling Works Testing: EBI Gate 200 OMSL Crossing Signalling Works Testing Specification
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT01 ISSUE 2
Title:
Risk Control Manual: Unloading Ballast from Sidetipper or Autoballaster
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT02 ISSUE 2
Title:
Risk Control Manual: Switch and Crossing Panel Vehicles (SCPV)
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT03 ISSUE 2
Title:
Risk Control Manual: Rail Milling and Grinding Truck RRV SF02 W-FS
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT05 ISSUE 2
Title:
Risk Control Manual: Working with On Track Machines, Tamper, Ballast Regulator, Stoneblower
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT06 ISSUE 2
Title:
Risk Control Manual: Working with On Track Machines, Rail Grinding and Support Teams
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT07 ISSUE 2
Title:
Risk Control Manual: Working with On Track Machines, Rail Grinders
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT08 ISSUE 2
Title:
Risk Control Manual: Continuous Welded Rail (CWR) Delivery/Recovery by Long Welded Rail Train (LWRT)
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/045/4.18 ISSUE 3
Title:
National Operating Procedure (NOP) 4.18: Management of Station Security and Crime
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/01 ISSUE 1
Title:
National Emergency Plan Index: Incident Response Framework
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/02 ISSUE 1
Title:
National Emergency Plan Index: Incident Command Escalation Stages
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/03 ISSUE 1
Title:
National Emergency Plan Index: Incident Roles and Responsibilities
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/04 ISSUE 1
Title:
National Emergency Plan Index: Strategic Commander Role
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/05 ISSUE 1
Title:
National Emergency Plan Index: Tactical Commander Role
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/06 ISSUE 1
Title:
National Emergency Plan Index: Operational Commanders and Other Incident Roles
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/07 ISSUE 1
Title:
National Emergency Plan Index: Communications and Situation Reporting
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/08 ISSUE 1
Title:
National Emergency Plan Index: Site Recovery and Restoration
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/09 ISSUE 1
Title:
National Emergency Plan Index: Specialist Incident Response
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/10 ISSUE 1
Title:
National Emergency Plan Index: Strategic Crisis Management
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/250/11 ISSUE 1
Title:
National Emergency Plan Index: Post Incident Review and Feedback
Organization: NR
Year: 2021
Status: Active
NR/L3/SCO/313/SP-1.02 ISSUE 3
Title:
On-Track Machines (OTMs) Driver and Operations Standards Manual: Recruitment and Selection of OTM Driver Operators
Organization: NR
Year: 2021
Status: Active
NR/L3/SCO/313/SP-1.07 ISSUE 3
Title:
On-Track Machines (OTMs) Driver and Operations Standards Manual: Transfer of OTM Drivers
Organization: NR
Year: 2021
Status: Active
NR/L3/SCO/313/SP-1.12 ISSUE 3
Title:
On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Licence Certificate
Organization: NR
Year: 2021
Status: Active
NR/L3/SCO/313/SP-2.02 ISSUE 2
Title:
On-Track Machines (OTMs) Driver and Operations Standards Manual: Urgent Safety Related Operating Advice
Organization: NR
Year: 2021
Status: Active
NR/L3/TEL/30181/015 ISSUE 1
Title:
Telecoms Maintenance Work Instructions Handbook: Maintenance of Closed Circuit Television Cameras
Organization: NR
Year: 2021
Status: Active
NR/L3/TEL/30181/016 ISSUE 1
Title:
Telecoms Maintenance Work Instructions Handbook: Maintenance of Closed Circuit Television Monitoring Equipment
Organization: NR
Year: 2021
Status: Active
NB 134 ISSUE 5
Title:
Transpositions on DC Track Circuits
Organization: NR
Year: 2021
Status: Active
NB 191 ISSUE 2
Title:
MWM Digital Record Card Pilot
Organization: NR
Year: 2021
Status: Active
NR/L3/TEL/30181/020 ISSUE 1
Title:
Telecoms Maintenance Work Instructions Handbook: Maintenance of Closed Circuit Television Video Recorders
Organization: NR
Year: 2021
Status: Active
B00104/1 ISSUE 1
Title:
Single and Double Line Block Typical Circuits - Electric Token Working - Terminal Token Instrument (Western) Internal Wiring
Organization: NR
Year: 2021
Status: Active
B00104/2 ISSUE 1
Title:
Single and Double Line Block Typical Circuits - Electric Token Working - Terminal Token Instrument (Tyers) Internal Wiring
Organization: NR
Year: 2021
Status: Active
B00105 ISSUE 1
Title:
Single and Double Line Block Typical Circuits - Electric Key Token - No Signaller Token with Remote Xing Loops N.S.T.R. Token Inst Internal Wiring
Organization: NR
Year: 2021
Status: Active
B00111 ISSUE 2
Title:
Single and Double Line Block Typical Circuits - Electric Token Working - Terminal Token Instrument with Operational Indicator
Organization: NR
Year: 2021
Status: Active
B00160 ISSUE 2
Title:
Single and Double Line Block Typical Circuits - BRB Standard Tokenless Block
Organization: NR
Year: 2021
Status: Active
F28382 ISSUE 1
Title:
FED Typical Circuits - Banner Repeater - Avoidance of Aspect Reversion with LED Banner Signal Heads
Organization: NR
Year: 2021
Status: Active
F34034 ISSUE 1
Title:
FED Typical Circuits - TPWS Method 3 - Avoidance of Aspect Reversion with LED Signal Heads
Organization: NR
Year: 2021
Status: Active
T02040 ISSUE 2
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Standard (Yellow) Inductor Circuits: 24V DC (Hardwired) Suppressor Magnet
Organization: NR
Year: 2021
Status: Active
T02050 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Standard Strength (Yellow) Series 2 Inductor Circuits: RRI 110V AC Electro & Suppressor
Organization: NR
Year: 2021
Status: Active
T02051 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits AWS - "Vortok" Extra Strength (Green) Series 2 - Inductor Circuits: RRI 110V AC Electro & Suppressor
Organization: NR
Year: 2021
Status: Active
T02052 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Standard Strength (Yellow) Series 2 Inductor Circuits: RRI 24V DC Electro
Organization: NR
Year: 2021
Status: Active
T02053 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Standard Strength (Yellow) Series 2 Inductor Circuits: RRI 24V DC Suppressor
Organization: NR
Year: 2021
Status: Active
T02060 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Standard Strength (Yellow) Series 2 Inductor Circuits: SSI 110V AC Electro & Suppressor
Organization: NR
Year: 2021
Status: Active
T02061 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Extra Strength (Green) Series 2 - Inductor Circuits: SSI 110V AC Electro & Suppressor
Organization: NR
Year: 2021
Status: Active
T02062 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Standard Strength (Yellow) Series 2 Inductor Circuits: SSI 24V DC Electro
Organization: NR
Year: 2021
Status: Active
T02063 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - AWS - "Vortok" Standard Strength (Yellow) Series 2 Inductor Circuits: SSI 24V DC Suppressor
Organization: NR
Year: 2021
Status: Active
T25000 ISSUE 4
Title:
Lineside & on Track Equipment Typical Circuits - Points - Point Control/Drive & Detection: Overview Sheet (1) - RRI
Organization: NR
Year: 2021
Status: Active
T25001 ISSUE 4
Title:
Lineside & on Track Equipment Typical Circuits - Points - Point Control/Drive & Detection: Overview Sheet (2) - SSI
Organization: NR
Year: 2021
Status: Active
T25010 ISSUE 7
Title:
Lineside & on Track Equipment Typical Circuits - POINTS - DC Detection For Use with Point Machines
Organization: NR
Year: 2021
Status: Active
T25011 ISSUE 1
Title:
Lineside & on Track Equipment Typical Circuits - POINTS - DC Detection For Use with HPSA Machines
Organization: NR
Year: 2021
Status: Active
T25625 ISSUE 2
Title:
Lineside & on Track Equipment Typical Circuits - POINTS - HPSS Machine LHSNC ECU on Left or RHSNC ECU on Right
Organization: NR
Year: 2021
Status: Active
T25626 ISSUE 4
Title:
Lineside & on Track Equipment Typical Circuits - POINTS - HPSS Machine LHSNC ECU on Right or RHSNC ECU on Left
Organization: NR
Year: 2021
Status: Active
T25630 ISSUE 2
Title:
Lineside & on Track Equipment Typical Circuits - POINTS - HPSS Machine Swing Nose Crossing LHSNC ECU on Left or RHSNC ECU on Right
Organization: NR
Year: 2021
Status: Active
NB 197 ISSUE 1
Title:
Digital Signal Maintenance Testing Handbook (SMTH) Project
Organization: NR
Year: 2021
Status: Active
NB 182 ISSUE 3
Title:
Train Detection Clearance Points
Organization: NR
Year: 2021
Status: Active
NB 193 ISSUE 2
Title:
Collis Hinged Signal Post Checks and Operation Procedure
Organization: NR
Year: 2021
Status: Active
NB 203 ISSUE 1
Title:
U Bolt Corrosion on Wig-Wags
Organization: NR
Year: 2021
Status: Active
NB 179 ISSUE 3
Title:
Alignment of Unipart Dorman Signal Heads
Organization: NR
Year: 2021
Status: Active
NB 188 ISSUE 2
Title:
TC SCWO Whilst Protected Under Rulebook Module TS11 Clause 15.3
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/SP01 ISSUE 4
Title:
Risk Control Manual: Use of Abrasive Wheels and Angle Grinders
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/SP08 ISSUE 3
Title:
Risk Control Manual: Use of Manual Trolleys/Rail Skate/Scooter
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/SP14 ISSUE 4
Title:
Risk Control Manual: Use of Rail Grinders
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/TK64 ISSUE 4
Title:
Risk Control Manual: Oxygen Fuel Gas Cutting and Heating
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30035 ISSUE 5
Title:
Signalling and Level Crossing Scheme Approval Process
Organization: NR
Year: 2021
Status: Active
NR/SIN/204 ISSUE 1
Title:
Special Inspection Notice of Operational Property Buildings for Inspection of Pitched Roofs Gable Walls
Organization: NR
Year: 2021
Status: Active
BRS-SE 12
Title:
Fuseholder - Porcelain for BS 714 Cartridge Fuse
Organization: NR
Status: Inactive
BRS-SE 12/1
Title:
Base for Fuseholder
Organization: NR
Status: Inactive
BRS-SE 12/2
Title:
Clip for Fuseholder
Organization: NR
Status: Inactive
NB 200 ISSUE 1
Title:
SPX BR843 - End Cap Gasket
Organization: NR
Year: 2021
Status: Active
NB 205 ISSUE 1
Title:
SPX BR843 - Door and Boom Detection Microswitches PA05/05379
Organization: NR
Year: 2021
Status: Active
NB 204/APP1 ISSUE 2
Title:
Signaller's Control Devices for Automatic Signals: NR/L2/SIG/30009/D310 (Issue 3), Control of Signals (and Supporting Standards)
Organization: NR
Year: 2021
Status: Active
NR/SIN/203 ISSUE 1
Title:
Special Inspection Notice of Escalator and Moving Walks Machine Safety Guarding
Organization: NR
Year: 2021
Status: Inactive
NB 139 ISSUE 5
Title:
Track Circuit Bonding in S&C
Organization: NR
Year: 2021
Status: Active
NR/SIN/202 ISSUE 1
Title:
Safety of DTS CCTV Polecat System
Organization: NR
Year: 2021
Status: Active
NR/L1/XNG/100 ISSUE 3
Title:
Level Crossings Asset Policy
Organization: NR
Year: 2021
Status: Active
NR/L2/OHS/032 ISSUE 3
Title:
Training, Competence and Assessment in Accident and Incident Investigation
Organization: NR
Year: 2021
Status: Active
NR/L2/RSK/290 ISSUE 2
Title:
Business Continuity Management (BCM) (aka NR/L2/OPS/290)
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11752 ISSUE 3
Title:
Train Detection Handbook (aka RT/E/S/11752)
Organization: NR
Year: 2021
Status: Active
NR/L1/TEL/30102 ISSUE 2
Title:
Network Rail Asset Management Policy - Telecommunications Engineering
Organization: NR
Year: 2021
Status: Active
NR/L2/TRK/038 ISSUE 8
Title:
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11400 ISSUE 8
Title:
HPSS Handbook
Organization: NR
Year: 2021
Status: Active
NR/L2/XNG/19608 ISSUE 8
Title:
Inspection of Level Crossing Systems (aka NR/L2/SIG/19608)
Organization: NR
Year: 2021
Status: Active
NR/L2/TEL/30135 ISSUE 6
Title:
Video Surveillance Systems (VSS)
Organization: NR
Year: 2021
Status: Active
NR/L2/TRK/035 ISSUE 1
Title:
Track Asset Management Strategies
Organization: NR
Year: 2021
Status: Active
NR/L3/INV/3001 ISSUE 7
Title:
Reporting and Investigation Manual
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/MG0221 ISSUE 6
Title:
Management Self Assurance Procedure
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11764 ISSUE 2
Title:
Track Circuit Interrupters (aka NR/E/S/11764)
Organization: NR
Year: 2021
Status: Active
NR/L3/TRK/3510 ISSUE 3
Title:
Rail Friction Management
Organization: NR
Year: 2021
Status: Active
NR/L3/ELP/21060 ISSUE 3
Title:
Work on or near 650/750 V DC Traction Power Distribution Equipment (Including the Issue of Safety Documentation) (aka NR/SP/ELP/21060)
Organization: NR
Year: 2021
Status: Active
NR/L3/ENV/305 ISSUE 3
Title:
How to Change Utility Supplies
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/251 ISSUE 4
Title:
Unmanned Aircraft System (Drone/UAS) Operations
Organization: NR
Year: 2021
Status: Active
NR/L3/TRK/7013 ISSUE 1
Title:
Planning and Installation of Temporary Rail Joints
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11752/PART C ISSUE 2
Title:
Train Detection Handbook Part C: Performance Requirements
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART E ISSUE 2
Title:
Train Detection Handbook Part E: Wheel Detector Configuration Parameters
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART G ISSUE 2
Title:
Train Detection Handbook Part G: Site Assessment Prior to Design
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART J ISSUE 2
Title:
Train Detection Handbook Part J: Track Circuit Installation Specification
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART Q ISSUE 2
Title:
Train Detection Handbook Part Q: Index of Components
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/REF ISSUE 2
Title:
Train Detection Handbook: References
Organization: NR
Year: 2001
Status: Active
NR/EPF/LV/001A ISSUE 1
Title:
Electric Points Heater F Exam Record Sheet
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-A ISSUE 7
Title:
Maintenance Specification for Fixed Plant Equipment: Standby Generators
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-C ISSUE 7
Title:
Maintenance Specification for Fixed Plant Equipment: Gas/Oil Fired Heating Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-E ISSUE 7
Title:
Maintenance Specification for Fixed Plant Equipment: Electrical installations and Equipment
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-Q ISSUE 7
Title:
Maintenance Specification for Fixed Plant Equipment: Signalling and Safety Related Power Supplies
Organization: NR
Year: 2021
Status: Active
NR/L2/RSE/100/05 ISSUE 4
Title:
Network Rail Assurance Panel Processes: Product Acceptance and Change to Network Rail Operational Infrastructure
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11400/ER/R/1/0410 ISSUE 1
Title:
HPSS Action Tables
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/B006 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Damaged Signalling Equipment
Organization: NR
Year: 2020
Status: Active
NR/L2/SIG/30009/D430 ISSUE 1
Title:
Signalling Principles Handbook: Provision of Derailment Detection
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30009/P060 ISSUE 2
Title:
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Interlocking of Points and Other Movable Infrastructure
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/B110 ISSUE 3
Title:
Signalling Works Testing IRSE Licensing Requirements
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS15-10 ISSUE 2
Title:
Signalling Works Testing: Operator's Control Unit
Organization: NR
Year: 2021
Status: Active
NR/L2/TRK/001/MOD01 ISSUE 8
Title:
Inspection and Maintenance of Permanent Way: Glossary
Organization: NR
Year: 2021
Status: Active
NR/L2/TRK/001/MOD18 ISSUE 7
Title:
Inspection and Maintenance of Permanent Way: Buffer Stops and Train Arresting Devices Inspection, Maintenance and Risk Assessment
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11752/PART D ISSUE 2
Title:
Train Detection Handbook Part D: Axle Counter Configuration Parameters
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART F ISSUE 2
Title:
Train Detection Handbook Part F: Track Circuit Configuration Parameters
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART H ISSUE 2
Title:
Train Detection Handbook Part H: Design Requirements
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART L ISSUE 2
Title:
Train Detection Handbook Part L: Operating Specification
Organization: NR
Year: 2001
Status: Active
NR/L2/SIG/11752/PART B ISSUE 3
Title:
Train Detection Handbook Part B: Overview and Definitions
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11752/PART S ISSUE 1
Title:
Train Detection Handbook Part S: Dimensions
Organization: NR
Year: 2021
Status: Active
NR/L1/XNG/100/02 ISSUE 3
Title:
Level Crossing Asset Policy: Level Crossing Technology Strategy
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-B ISSUE 8
Title:
Maintenance Specification for Fixed Plant Equipment: Electrical Points Heating Installations
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-D ISSUE 7
Title:
Maintenance Specification for Fixed Plant Equipment: Air Conditioning and Ventilation Equipment
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-J ISSUE 7
Title:
Maintenance Specification for Fixed Plant Equipment: Sewage Disposal Plant
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/27238/APP-R ISSUE 7
Title:
Maintenance Specification for Fixed Plant Equipment: Moving Bridges
Organization: NR
Year: 2021
Status: Active
NR/L2/XNG/19608/MOD01 ISSUE 1
Title:
Inspection of Level Crossing Systems: Inspection of Level Crossings Systems - Assurance
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11400/ER/R/1/0183 ISSUE 6
Title:
HPSS Spares Catalogue
Organization: NR
Year: 2021
Status: Active
NR/L3/ELP/21060/D
Title:
Network Rail Certificate of Isolation for 650/750V D.C. Lineside Equipment
Organization: NR
Year: 2021
Status: Active
NR/FP C001 ISSUE 5
Title:
Fixed Plant Work Instructions: Maintenance of Electric Points Heating
Organization: NR
Year: 2021
Status: Active
NR/FP C021A ISSUE 5
Title:
Fixed Plant Work Instructions: 'Bender' IRDH265 (RS2) Readings and Test Instructions
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS6-61 ISSUE 2
Title:
Signalling Works Testing Handbook: HPSS Signalling Works Testing Specification
Organization: NR
Year: 2021
Status: Active
NR/FP C040 ISSUE 5
Title:
Fixed Plant Work Instructions: Fixed Standby Diesel Generators
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30009/D410 ISSUE 2
Title:
Signalling Principles Handbook: Provision of Trapping Protection
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/A210 ISSUE 4
Title:
Signalling Works Testing Processes for Minor Alterations
Organization: NR
Year: 2021
Status: Active
NR/FP C100 ISSUE 5
Title:
Fixed Plant Work Instructions: Functional Supply Points (FSPs)
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30014/D120/TS15-01 ISSUE 2
Title:
Signalling Works Testing: Staff Protection Device / System Test Specification
Organization: NR
Year: 2021
Status: Active
NR/FP C020 ISSUE 5
Title:
Fixed Plant Work Instructions: Signalling Principal Supply Point Switchgear and Control Gear
Organization: NR
Year: 2021
Status: Active
NR/L2/SIGELP/50000/MODA ISSUE 2
Title:
Inspection and Maintenance Periodicities (Including Risk Based Maintenance Criteria) for Signalling Power Distribution Equipment above 175 Volts - This standard should only be used for reference to...
Organization: NR
Year: 2021
Status: Active
NR/L2/TRK/038/01 ISSUE 3
Title:
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits: Train Borne Recording - This standard should only be used for reference to ensure 'The Control of Risk' unt...
Organization: NR
Year: 2021
Status: Active
NR/L3/ELP/21060/C
Title:
Network Rail Certificate of Isolation for 650/750V D.C. Apparatus
Organization: NR
Year: 2021
Status: Active
NR/L3/INV/3001/901 ISSUE 2
Title:
Reporting and Investigation Manual: Management of Recommendations and Local Actions
Organization: NR
Year: 2021
Status: Active
NR/FP C022A ISSUE 5
Title:
Fixed Plant Work Instructions: Portable Insulation Monitoring Tester - Operating Instructions
Organization: NR
Year: 2021
Status: Active
NR/FP C060 ISSUE 5
Title:
Fixed Plant Work Instructions: Uninterruptible Power Supplies (10kVA and above)
Organization: NR
Year: 2021
Status: Active
NR/L3/INV/3001/903 ISSUE 2
Title:
Reporting and Investigation Manual: Risk Ranking Events Including Operational Close Calls, Their Reporting and Level 1 Investigations
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/A003 ISSUE 4
Title:
General Instructions to Staff Working on S&T Equipment: Definitions
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/A015 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Cyber Security
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/A017 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Working on Equipment
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/B004 ISSUE 2
Title:
General Instructions to Staff Working on S&T Equipment: Preservation of Evidence After Accidents and Incidents
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D001 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Before Starting Work
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D021 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Plans and Diagrams of Engineering Details
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D023 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Circuit Diagrams - Symbols and Nomenclature
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D025 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Version Control of Diagrams
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E001 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Electrical Interference
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E004 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Safe Handling of Electrostatic Sensitive Devices
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E002 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Electromagnetic Compatibility with Rolling Stock
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E022 ISSUE 4
Title:
General Instructions to Staff Working on S&T Equipment: Rectification of Earth Faults
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E052 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Insulation of Unterminated Wires
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E055 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Rusty Rails
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G002 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Status of Existing Cable - Check Sheet
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G004 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Cable Terminated on Left Hand Side - Check Sheet
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G006 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Top-Nutted Cable on Left Hand Side - Check Sheet
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G008 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Cable on Left Hand Side Changeover - Check Sheet
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/M003 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Alignment of Unipart Dorman Signal Heads
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/P011 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Labelling Internal Equipment
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/R001 ISSUE 2
Title:
General Instructions to Staff Working on S&T Equipment: Remote Maintenance - EBI Track 200 Calibration Guide
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/R003 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Track Circuit Calibration for Remote Condition Monitoring (RADAR)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/T002 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Emergency Testing
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U002 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Inspection and Safety of Tools, Plant and Protective Equipment
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U007 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Checking Gauges
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U017 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Insulation Displacement Connectors
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U020 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Meters for Signalling Use
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U041 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Miscellaneous Test Equipment
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U043 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: AWS Strength and Polarity Meter
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/W004 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Common Worksite Hazards for S&T Staff
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/W012 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Polychlorinated Biphenyls (PCBs)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/X021 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Safety in Battery Rooms
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G110 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Testing of Extensive and Simultaneous and Functionally Equivalent Works, Using Signal Maintenance Testing Techniques
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AP1051 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Install a TPWS Filter Module
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AP1061 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Isolation of TPWS Equipment at Simple Permanent Speed Restrictions (PSR)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AR1002 ISSUE1
Title:
Signal Maintenance Testing Handbook: Temporary Bonding Out of Rails (and Reinstatement)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AR1004 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Temporary Strapping of Proving Contact (and Reinstatement)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/CA1003 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Recover an Existing Wire and / or Install a New Wire as Part of SITH Work
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/EL1051 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Install a Track Circuit Relay Counter
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/EL1052 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Install a Varistor Surge Protector
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/ER1001 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Installation of Intelligent Infrastructure Data Logger
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/SG1062 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Filament Type MSL Conversion to LED MSL
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/SS1051 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Install a New or Replacement SSI LDT Filter
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G310 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Signalling Intermediate Testing - Check Marking and Recording on Test Copies
Organization: NR
Year: 2021
Status: Active
NR/L3/SIGELP/50001/SPS M003 ISSUE 4
Title:
Signalling Power Distribution Equipment Above 175 V AC (Work Instructions): Insulation Resistance Monitoring Management and Maintenance
Organization: NR
Year: 2021
Status: Active
TEF 3252 ISSUE 1
Title:
Temporary Rail Joint Installation and Inspection Form
Organization: NR
Year: 2021
Status: Active
TWI 2T012 ISSUE 2
Title:
How to Carry out Manual Lift and Pack of Plain Line Track
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U004 ISSUE 4
Title:
General Instructions to Staff Working on S&T Equipment: Hardlock Nuts
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/MG0176/05 ISSUE 5
Title:
Ellipse Work Management Handbook: Key Performance Indicator Reports
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/A013 ISSUE 4
Title:
General Instructions to Staff Working on S&T Equipment: Briefing of Standards
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/A016 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Definition of Safety-Critical Work
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/B003 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Releases and Restoration
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/B005 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Remote Reset of Signalling Equipment
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/C001 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Clearances for S&T Equipment
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D013 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Temporary Signalling Alterations for Emergency Trackwork
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D022 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Circuit Diagrams - Colouring
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D024 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Circuit Diagrams - Wiring
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/D031 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Site Records
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E003 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Use of Mobile Telephones, Radio Transmitters and Un-Suppressed Portable Devices
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E005 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Segregation of Wiring
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E041 ISSUE 4
Title:
General Instructions to Staff Working on S&T Equipment: Signalling Circuits in Telecommunication Systems
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/E054 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Securing Points Out of Use
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G001 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Cable Replacement - Top Nutting Process
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G003 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Cables Terminated on Right Hand Side - Check Sheet
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G005 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Top-Nutted Cable on Right Hand Side Check Sheet
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/G007 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Cable on Right Hand Side Changeover - Check Sheet
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/M002 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Seasonal Precautions
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/P001 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Painting of Signalling Equipment
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/P015 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Safety Signs for S&T Installations
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/R002 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Remote Signalling Busbar Monitoring (II)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U001 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Tools, Measuring Instruments and Calibration
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U005 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Torque Wrenches
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U012 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Extractor Tools
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U019 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Use of the Volt Stick
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U021 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Insulation Test Equipment
Organization: NR
Year: 2021
Status: Active
NB 204/INDEX ISSUE 3
Title:
Updates to Requirements for Provision of Controls and Information for Signallers to Enable Safe and Effective Monitoring and Control of the Railway
Organization: NR
Year: 2021
Status: Active
NB 204/APP2 ISSUE 1
Title:
Updates to Signal Box Diagram, Panel and VSCS Map Symbols
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/X011 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Electrical Safety - Cathode Ray Tubes
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/W011 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Asbestos
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/W002 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Portable Plant, Tools and Materials at the Lineside
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/U042 ISSUE 3
Title:
General Instructions to Staff Working on S&T Equipment: Earth Fault Test Adapters
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AR1005 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Temporary Strapping of Ground Frame Proving (and Reinstatement)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G120 ISSUE 1
Title:
Signal Maintenance Testing Handbook: SITH Test Schedule
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AP1053 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Relocate a TPWS Buffer Stop Arming Loop
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AR1001 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Temporary Strapping of Point Detection (and Reinstatement)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/AR1003 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Converting a 50Hz Double Rail Track Circuit to a Single Rail Track Circuit (and Reinstatement)
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/EL1023 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Replace an Electro-mechanical banner repeating signal with an LED type, using a Howells Interface Unit
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/EL1053 ISSUE 1
Title:
Signal Maintenance Testing Handbook: PIN Code 202 (Style QS1) Relay and Plugboard Conversion to PIN Code 201 (Style QS2) Relay and Plugboard
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/SG1061 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Filament Type Drivers Crossing Indicator (DCI) Conversion to LED DCI
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G130/SG1063 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Filament type Level Crossing Road Traffic Lights conversion to LED LX RTL
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/11235/G210 ISSUE 1
Title:
Signal Maintenance Testing Handbook: Production and Acceptance of G130 Test Plans, and Acceptance of Associated G120 Test Schedules
Organization: NR
Year: 2021
Status: Active
NR/L3/SIGELP/50001/SPS M002 ISSUE 5
Title:
Signalling Power Distribution Equipment Above 175 V AC (Work Instructions): Defect Management of Signalling Power Distribution Equipment above 175 V AC
Organization: NR
Year: 2021
Status: Active
NR/L3/SIGELP/50001/SPS A001 ISSUE 2
Title:
Signalling Power Distribution Equipment Above 175 V AC (Work Instructions): Maintenance Periodicities - This standard should only be used for reference to ensure 'The Control of Risk' until the com...
Organization: NR
Year: 2021
Status: Active
NR/L3/TRK/3510/A01 ISSUE 2
Title:
Rail Friction Management: Lubrication of Plain Line Running Rails, Check Rails and S&C
Organization: NR
Year: 2021
Status: Active
TWI 2G041 ISSUE 2
Title:
How to Install a Temporary Rail Joint
Organization: NR
Year: 2021
Status: Active
NR/L3/SIG/10064/GI/B008 ISSUE 1
Title:
General Instructions to Staff Working on S&T Equipment: Disconnections - Additional Protection for Line Blockages by Signalling Disconnections or Technician's Controls
Organization: NR
Year: 2021
Status: Active
NB 206 ISSUE 1
Title:
NETWORK RAIL - CCS (TA) Change to the Hole Centres of the Web Drive Brackets Used on HPSS Installations - from 180mm to 220mm
Organization: NR
Year: 2021
Status: Active
NR/L2/P3M/107/GUIDANCE ISSUE 1
Title:
Contingency Management for Capital Delivery Projects, Programmes, and Portfolios - Technical Guidance Note: Forecasting Contingency Spend
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/J03 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Specification for Overlay Miniature Stop Light Level Crossing Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/19820/J04 ISSUE 1
Title:
Signalling and Level Crossing Product Specifications: Specification for Interfaced Overlay Miniature Stop Light Level Crossing Systems
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/045/4.04 ISSUE 2
Title:
National Operating Procedure (NOP) 4.04: Incident Management - Initial Advice and Guidance
Organization: NR
Year: 2021
Status: Active
NR/GN/OTK/5000 ISSUE 3
Title:
Index of Off-Track and Drainage Drawings
Organization: NR
Year: 2021
Status: Active
NR/GN/SIG/17901 ISSUE 5
Title:
SSI Configuration Guide
Organization: NR
Year: 2021
Status: Active
NR/L1/CIV/601 ISSUE 1
Title:
Managing the Highways Interface
Organization: NR
Year: 2021
Status: Active
NR/L2/ASR/036 ISSUE 6
Title:
Assurance Framework
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/032 ISSUE 1
Title:
The Management of Structures Manual
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/084 ISSUE 3
Title:
Management of Tunnels
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/086 ISSUE 11
Title:
Management of Earthworks Manual
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/169 ISSUE 2
Title:
Design of Tunnels
Organization: NR
Year: 2021
Status: Active
NR/L3/CIV/170 ISSUE 2
Title:
Assessment of Tunnels
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/602 ISSUE 1
Title:
Highways Interface Planning Process
Organization: NR
Year: 2021
Status: Active
NR/L2/ELP/21028 ISSUE 4
Title:
Ancillary Wiring and Connections of Electrical Equipment on AC & DC Electrified Lines (aka NR/SP/ELP/21028)
Organization: NR
Year: 2021
Status: Active
NR/L2/RSE/100 ISSUE 7
Title:
Network Rail Assurance Panel Processes
Organization: NR
Year: 2021
Status: Active
NR/L3/CIV/0063 ISSUE 1
Title:
Pilling, Drilling, Crane, MEWP and SMPT Operations Adjacent to the Railway
Organization: NR
Year: 2021
Status: Active
NR/L2/TEL/31200 ISSUE 1
Title:
Design of High-Capacity Fibre Cable Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/TEL/30179 ISSUE 1
Title:
Design of Fibre Distribution Systems and Fibre End-User Connections
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/50040 ISSUE 1
Title:
Temporary Speed Restrictions
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11120 ISSUE 11
Title:
Notice Boards and Technical Instructions
Organization: NR
Year: 2021
Status: Active
NR/L3/CIV/603 ISSUE 1
Title:
Working at the Highways Interface
Organization: NR
Year: 2021
Status: Active
NR/L3/CIV/604 ISSUE 1
Title:
Highways Interface Manual
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/084 ISSUE 6
Title:
Line Clear Arrangements Following Engineering Works in Axle Counter Areas - Line Clear Verification Process
Organization: NR
Year: 2021
Status: Active
NR/L3/TEL/40047 ISSUE 5
Title:
Process for the Management of Safety Related Reports for Telecoms Failures
Organization: NR
Year: 2021
Status: Active
NR/L2/TRK/3419 ISSUE 1
Title:
Lifting, Storing and Transporting Track Materials
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30009/A200 ISSUE 3
Title:
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30009/D310 ISSUE 4
Title:
Signalling Principles Handbook: Control of Signals
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30009/H060 ISSUE 2
Title:
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Train Protection and Automatic Warning Systems
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/30009/K210 ISSUE 1
Title:
Signalling Principles Handbook: Axle Counter System Application Principles
Organization: NR
Year: 2021
Status: Active
NR/L2/TRK/001/MOD20 ISSUE 2
Title:
Inspection and Maintenance of Permanent Way: Plain Line Pattern Recognition Management
Organization: NR
Year: 2021
Status: Active
NR/L3/CIV/604/MOD01 ISSUE 1
Title:
Highways Interface - Qualifications for Supervisors and Operatives
Organization: NR
Year: 2021
Status: Active
NR/L3/CIV/604/MOD02 ISSUE 1
Title:
Highways Interface - Works Quality and Inspection
Organization: NR
Year: 2021
Status: Active
NR/L3/CIV/604/MOD03 ISSUE 1
Title:
Highways Interface - Network Rail Major Bridge and Major Transport Works (Diversionary Works)
Organization: NR
Year: 2021
Status: Active
NR/L3/MTC/RCS0216/MAT04 ISSUE 3
Title:
Risk Control Manual: Continuous Welded Rail (CWR) Delivery by Rail Delivery Train (RDT)
Organization: NR
Year: 2021
Status: Active
NR/L3/SCO/313/SP-1.03 ISSUE 3
Title:
On-Track Machines (OTMs) Driver and Operations Standards Manual: Medical Standards for OTM Driver Operators
Organization: NR
Year: 2021
Status: Active
NR/L3/SCO/313/SP-1.10 ISSUE 3
Title:
On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Route Knowledge
Organization: NR
Year: 2021
Status: Active
NR/L3/TRK/1015/MOD02 ISSUE 4
Title:
Management of Basic Visual Inspection: Plain Line Pattern Recognition - Introduction and Support
Organization: NR
Year: 2021
Status: Active
NR/GN/CIV/100/07 ISSUE 1
Title:
Strategic Design Manual: Masterplanning at Stations
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/032/MOD01 ISSUE 1
Title:
The Management of Structures Manual: Structures Asset Register Data Requirements
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/032/MOD02 ISSUE 1
Title:
The Management of Structures Manual: Structures Asset Risk Appraisal
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/032/MOD02A ISSUE 1
Title:
The Management of Structures Manual: Retaining Walls Risk-Based Prioritisation Procedures
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/032/MOD03 ISSUE 1
Title:
The Management of Structures Manual: Management of Post-Tensioned Concrete Bridges
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/032/MOD04 ISSUE 1
Title:
The Management of Structures Manual: Structures Asset Evaluation
Organization: NR
Year: 2021
Status: Active
NR/L2/CIV/086/MOD01 ISSUE 2
Title:
Management of Earthworks Manual: Earthwork Evaluations
Organization: NR
Year: 2021
Status: Active
NR/L2/OHS/501/W3 ISSUE 2
Title:
Trackworker Protection and Warning Systems: Module W3: Lookout Operated Warning System (LOWS)
Organization: NR
Year: 2021
Status: Active
NR/L2/RSE/100/02 ISSUE 4
Title:
Network Rail Assurance Panel Processes: Application of the Common Safety Method for Risk Evaluation and Assessment
Organization: NR
Year: 2021
Status: Active
NR/L2/RSE/100/03 ISSUE 3
Title:
Network Rail Assurance Panel Processes: The Application of the Railways (Interoperability) Regulations for Network Rail
Organization: NR
Year: 2021
Status: Active
NR/L2/RSE/100/08 ISSUE 1
Title:
Network Rail Assurance Panel Processes: Guidance on the Application of the Common Safety Method for Risk Evaluation and Assessment
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11201/MOD A3-3 ISSUE 3
Title:
Signalling Design Handbook: Signalling Scheme Plans
Organization: NR
Year: 2021
Status: Active
NR/L2/SIG/11201/MOD B7 ISSUE 8
Title:
Signalling Design Handbook: Interlockings - General
Organization: NR
Year: 2021
Status: Active
SSI8500I ISSUE 8
Title:
Design of SSI Schemes - Chapter I: Equipment Procurement and Specifications
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/107/SPEC ISSUE B02
Title:
Class I Welded Mesh Open Steel Mesh Panel - Specification
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/108/SPEC ISSUE B02
Title:
Class I & Class II Expanded Mesh Fence - Specification
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/109/SPEC ISSUE B02
Title:
Class I General Purpose Palisade Fence - Specification
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/110/SPEC ISSUE B02
Title:
Class IA Security Palisade Slotted or Bolted Pale System Fence - Specification
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/113/SPEC ISSUE B02
Title:
Class II Close Boarded Fence - Specification
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/102 ISSUE B02
Title:
Class III High Tensile Agricultural Timber Post Livestock Fence - Drawing
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/111 ISSUE B02
Title:
Class III High Tensile Pre-Clipped Metallic Post System Fence - Drawing
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/112 ISSUE B02
Title:
Class III High Tensile Post-Clipped Metallic Post System Fence - Drawing
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/105/SPEC ISSUE B02
Title:
Class II Welded Mesh - Mesh Roll Steel Post Fence - Specification
Organization: NR
Year: 2021
Status: Active
NR/OTK/SD/BM/106/SPEC ISSUE B02
Title:
Class II Chain Link & Steel Post Fence - Specification
Organization: NR
Year: 2021
Status: Active
E10083/10 ISSUE 3
Title:
Typical Circuits Former Western Region A.W.S. Inductors Permissive Working in Platform Inc Where There Are No Huddersfield Controls
Organization: NR
Year: 2021
Status: Active
P01011 ISSUE 1
Title:
Control Area Interlocking - Index
Organization: NR
Year: 2021
Status: Active
P01012 ISSUE 1
Title:
Control Area Interlocking - Case A Profile & Analysis
Organization: NR
Year: 2021
Status: Active
P01013 ISSUE 1
Title:
Control Area Interlocking - Case A Location Wiring
Organization: NR
Year: 2021
Status: Active
P01014 ISSUE 1
Title:
Control Area Interlocking - Case A Battery Detail
Organization: NR
Year: 2021
Status: Active
P01015 ISSUE 1
Title:
Control Area Interlocking - Case A Load Output and RCM
Organization: NR
Year: 2021
Status: Active
P01016 ISSUE 1
Title:
Control Area Interlocking - Case A Wind Connections
Organization: NR
Year: 2021
Status: Active
P01017 ISSUE 1
Title:
Control Area Interlocking - Case A Solar Connections
Organization: NR
Year: 2021
Status: Active
P01018 ISSUE 1
Title:
Control Area Interlocking - Case B Profile & Analysis
Organization: NR
Year: 2021
Status: Active
P01019 ISSUE 1
Title:
Control Area Interlocking - Case B Location Wiring
Organization: NR
Year: 2021
Status: Active
R02010 ISSUE 3
Title:
Route Relay interlocking, Typical Circuits AWS Complex Inhibition Control & Through Circuits Where Huddersfield Controls Not Provided
Organization: NR
Year: 2021
Status: Active
T02010 ISSUE 6
Title:
Lineside & on Track Equipment Typical Circuits AWS Inductor Circuits Inhibition (Simple & Complex) Control Circuits Where Huddersfield Controls Not Provided
Organization: NR
Year: 2021
Status: Active
T25735 ISSUE 3
Title:
Lineside & on Track Typical Circuits Points - Hy-Drive - Detection Circuits 'SO' - Hy-Drive LHSNC
Organization: NR
Year: 2021
Status: Active
T25736 ISSUE 3
Title:
Lineside & on Track Typical Circuits Points - Hy-Drive - Detection Circuits 'SO' - Hy-Drive RHSNC
Organization: NR
Year: 2021
Status: Active
NR/GN/CIV/100/04 ISSUE 1
Title:
Strategic Design Manual: Climate Action Design Manual for Buildings and Architecture
Organization: NR
Year: 2021
Status: Active
NR/L3/SCO/311/07 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Document Control, Review and Revision
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/08 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/09 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/10 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Post-Accident and Incident
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/11 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Level 1 Inspections
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/12 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Programme
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311 ISSUE 5
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/01 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Entity in Charge of Maintenance
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/02 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/03 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Technical Asset Management Meeting
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/04 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Engineering Change
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/05 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Contractual Arrangements
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/19 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Driving and Operational Requirements
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/06 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/20 ISSUE 1
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Handover and Handback of Rail Vehicles
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/21 ISSUE 1
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Data Management
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/13 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Facilities, Planning and Supervision
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/14 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Recording
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/15 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Tools and Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/16 ISSUE 3
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Management of Safety Related Components
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/17 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/311/18 ISSUE 2
Title:
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Reporting of Corrective Maintenance and Repairs
Organization: NR
Year: 2022
Status: Active
NR/SIN/207 ISSUE 1
Title:
Duvine DD920 Battery Chargers
Organization: NR
Year: 2021
Status: Active
NR/L3/OPS/045/2.01 ISSUE 4
Title:
National Operating Procedure (NOP) 2.01: Quality Assurance in Occupational Competence
Organization: NR
Year: 2022
Status: Active
NR/L3/OPS/045/2.25 ISSUE 1
Title:
National Operating Procedure (NOP) 2.25: Rest Break Management Process
Organization: NR
Year: 2022
Status: Active
NR/SIN/206 ISSUE 2
Title:
Managing Wheel Strike Risk at Cast Obtuse Crossings
Organization: NR
Year: 2022
Status: Active
NB 207 ISSUE 1
Title:
SMTH Part 06 and SMS Part T
Organization: NR
Year: 2022
Status: Active
NR/L2/OHS/053 ISSUE 3
Title:
Assessing the Risk of Stress in the Workplace
Organization: NR
Year: 2022
Status: Active
NR/L2/OHS/501/W1 ISSUE 3
Title:
Trackworker Protection and Warning Systems: Module W1: Semi-Automatic Track Warning System (SATWS)
Organization: NR
Year: 2022
Status: Active
NR/GN/RMVP/27702 ISSUE 3
Title:
Plant Product Acceptance Process - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this ...
Organization: NR
Year: 2022
Status: Active
NR/GN/TRK/9023 ISSUE 1
Title:
Tri Metallic Zone Weld Repair
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/094 ISSUE 2
Title:
National Asset Protection and Optimisation Delivery Framework
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/192 ISSUE 2
Title:
Management of Lift Assets
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/195 ISSUE 2
Title:
Management of Escalator and Moving Walk Assets
Organization: NR
Year: 2022
Status: Active
NR/L1/INF/02220 ISSUE 2
Title:
Document and Records Management (aka NR/L2/INF/02220)
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/096 ISSUE 2
Title:
Asset Protection and Optimisation Management of Outside Party Works
Organization: NR
Year: 2022
Status: Active
NR/L2/CSG/STP001 ISSUE 9
Title:
Standards and Controls Management
Organization: NR
Year: 2022
Status: Active
Search Within NR