NR/L2/ELP/CTM028 ISSUE 3
Title: Competence and Training in OLE Construction Engineering (aka NR/L2/CTM/028)
Organization: NR
Year: 2022
Status: Active
NR/L2/RSE/070 ISSUE 3
Title: Engineering Verification
Organization: NR
Year: 2022
Status: Active
NR/L2/SCO/306 ISSUE 5
Title: Disposal of Redundant Assets
Organization: NR
Year: 2022
Status: Active
NR/L2/TEL/30022 ISSUE 8
Title: Engineering Assurance Arrangements for Communications Engineering Schemes and Services
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/029 ISSUE 6
Title: Wood Sleepers, Bearers and Longitudinal Bearer Systems
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/7014 ISSUE 2
Title: Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way (aka NR/L3/TRK/7014)
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/198 ISSUE 1
Title: Lift Construct, Commission and Decommission
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/199 ISSUE 1
Title: Escalator and Moving Walk Construct, Commission and Decommission
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/EP0235 ISSUE 1
Title: Maintenance of Lineside Wheel Impact Load Detector (WILD) and Radio Frequency Identification (RFID) Tag Reader Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/P3M/132 ISSUE 2
Title: Consolidated Planning of Key Resources for Delivery of Planned Works (aka NR/L3/INI/P3M/132)
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/306 ISSUE 2
Title: Disposal of Redundant Assets
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/200/03 ISSUE 1
Title: Station Design Manual: Station Facilities & Amenities
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/200/10 ISSUE 1
Title: Station Design Manual: Public Realm Design Guidance for Stations
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/200/11 ISSUE 1
Title: Station Design Manual: Parking & Mobility at Stations
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/192/03 ISSUE 1
Title: Management of Lift Assets: Lift Construct, Commission and Decommission
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/192/05 ISSUE 1
Title: Management of Lift Assets: Lift Measure
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/192/06 ISSUE 1
Title: Management of Lift Assets: Lift Assurance
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/195/03 ISSUE 1
Title: Escalators and Moving Walk Construct, Commission and Decommission
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/195/05 ISSUE 1
Title: Escalator and Moving Walk Measure
Organization: NR
Year: 2022
Status: Active
NR/L1/CIV/195/06 ISSUE 1
Title: Escalator and Moving Walk Assurance
Organization: NR
Year: 2022
Status: Active
NR/L2/CSG/STP001/01 ISSUE 9
Title: Standards and Controls Management: Principles of Standard and Control Management
Organization: NR
Year: 2022
Status: Active
NR/L2/CSG/STP001/03 ISSUE 4
Title: Standards and Controls Management: Drafting Criteria for Standards and Control Documents
Organization: NR
Year: 2022
Status: Active
NR/L2/CSG/STP001/04 ISSUE 8
Title: Standards and Controls Management: Managing Variations to Network Rail Standards and Control Documents and Railway Group Standards
Organization: NR
Year: 2022
Status: Active
NR/L2/CSG/STP001/05 ISSUE 2
Title: Standards and Controls Management: Producing Bowties and Using them to Support the Management of Standards and Control Documents
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/002 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC 1: Access Overhead Lines Construction Sites
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/001 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC Trainee Linesman: Undertake Low Level Activities (under Direction) & Workshop Skills
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/003 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC 2: Assist with the Construction, Renewal, Enhancement, and Modification of OLE in Accordance with Design Drawings and Specifications
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/004 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC 3: Lead in the Construction, Renewal, Enhancement, and Modification of OLE in Accordance with Design Drawings and Specifications
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/005 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC 4: Control and Supervise OLE Construction Renewal and Enhancement Activities in Line with Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/006 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC 5A: Confirm the OLE is Safe for Operational Purposes Between minor OLE Construction Activities
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/007 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC 5B: Confirm the OLE Is Safe for Operational Purposes Between General OLE Construction Activities
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/CTM028/008 ISSUE 1
Title: Competence and Training in OLE Construction Engineering: OLEC 5C: Confirm the OLE Is Safe for Operational Purposes Between Complex OLE Construction Activities
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/19820/K02 ISSUE 1
Title: Signalling and Level Crossing Product Specifications: Equipment Enclosures
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/001/MOD11 ISSUE 11
Title: Inspection and Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/0132/01 ISSUE 1
Title: Maintenance Arc Welding of Rails, Switches and Crossings: Weld Repair of Plain Line Rail
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/0132/02 ISSUE 1
Title: Maintenance Arc Welding of Rails, Switches and Crossings: Weld Repair of Crossings
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/7014/01 ISSUE 1
Title: Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way: Implementation and Assurance of Standardised Risk Based Maintenance
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/7014/02 ISSUE 1
Title: Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way: General Requirements for all Track Systems
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/7014/03 ISSUE 1
Title: Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way: Plain Line Track - Dynamically Recorded Geometry
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/7014/04 ISSUE 1
Title: Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way: Switches and Crossings - Dynamically Recorded Geometry
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/01 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: MMT Operational Safety
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/03 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: MMT Planning Procedure for Possession Working
Organization: NR
Year: 2022
Status: Active
NR/L3/OPS/045/5.06 ISSUE 2
Title: National Operating Procedure (NOP) 5.06: Management of the Platform Training Interface Risk
Organization: NR
Year: 2022
Status: Active
NR/L3/TEL/30181/011 ISSUE 2
Title: Telecoms Maintenance Work Instructions Handbook: Maintenance of Operational Telephones
Organization: NR
Year: 2022
Status: Active
NR/L3/TRK/1015/MOD03 ISSUE 1
Title: Management of Basic Visual Inspection: Inspection for RBM Regimes
Organization: NR
Year: 2022
Status: Active
NR/L2/CSG/STP001/02 ISSUE 9
Title: Standards and Controls Management: Managing Standard and Control Document Change Projects
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/02 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Car Park Near Track & Servicing Station
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/02/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Car Park Near Track, Servicing Station - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/03 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Car Park Near Non-Operational Track and/or Station
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/03/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Car Park, Near Unfinished or Non-Operational Track and/or to Service Unfinished Station - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/04 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Car Park Near Track not Servicing Station
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/04/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Car Park Near to Track Only - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/05 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Car Park Away from Track
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/05/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Car Park Away from Track, Does Not Service Station - Diagram
Organization: NR
Year: 2022
Status: Inactive
NR/L3/OHS/005/06 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Building Near to Track
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/06/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Building Near to Track - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/07 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Building Away From Track
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/07/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Building Away From Track - Diagram
Organization: NR
Year: 2022
Status: Inactive
NR/L3/OHS/005/08 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Electric Vehicle Charging Point
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/08/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Electric Vehicle Charging Point Installed in Car Park - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/09 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Solar Panel Array
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/09/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Solar Panel Array Installed on Roof of Office Building - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/10 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Electricity Meter Installed in Office Building
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/10/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Electricity Meter Installed in Office Building - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/11 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Arch Unit Refit
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/11/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Arch Unit Refit (No Service Entrance) - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/12 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Roof or Canopy Away From Track
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/12/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Generic Roof / Canopy Away from Track
Organization: NR
Year: 2022
Status: Inactive
NR/L3/OHS/005/13 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for Station Retail Unit Refit
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/13/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: Station Retail Unit Refit (Not on Platform)
Organization: NR
Year: 2022
Status: Active
TEF 3301 ISSUE 1
Title: Welders Work Return - Tri-Metal Weld Repair
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/CP009 ISSUE 11
Title: COVID-19 Contingency Plan: Safe Working Practices
Organization: NR
Year: 2022
Status: Active
NB 209 ISSUE 1
Title: SFI Temporary Arrangements
Organization: NR
Year: 2022
Status: Active
NB 210 ISSUE 1
Title: Frauscher Axle Counter Comm Failure
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/27238/APP-F ISSUE 7
Title: Maintenance Specification for Fixed Plant Equipment: Lighting Installations
Organization: NR
Year: 2022
Status: Active
TWI 3S110 ISSUE 1
Title: How to Carry Install an Additional Check Block Within the Wing Rail Extension
Organization: NR
Year: 2022
Status: Active
NR/L3/RSE/0074 ISSUE 2
Title: Project Advice Note (PAN) Process (aka NR/L3/INI/CP0074)
Organization: NR
Year: 2022
Status: Active
NR/L3/RSE/0074/F0030 ISSUE 32
Title: PAN (Project Advice Note) Register (aka NR/L3/INI/CP0074/F0030)
Organization: NR
Year: 2022
Status: Active
NR/SIN/105 ISSUE 2
Title: Inspection of Vossloh Type Baseplate Screws in RT60 & NR60 S&C
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/F100 ISSUE 1
Title: Signalling Works Testing: Methodology for Control Tables and Principles Testing
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS17-41 ISSUE 1
Title: Signalling Works Testing: Integration Testing - E&P Signalling Power Feeder to Signalling System Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS16-01 ISSUE 2
Title: Signalling Works Testing: Signalling Scheme Plan Verification Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/E110 ISSUE 3
Title: Signalling Works Testing Glossary
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS11-01 ISSUE 4
Title: Signalling Works Testing: Control Tables and Principles Testing Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS5-01 ISSUE 5
Title: Signalling Works Testing: Signal Works DC Track Circuit Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D110 ISSUE 7
Title: Signalling Works Testing: Signalling Works Test Specification and Certificate Requirements
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/A110 ISSUE 6
Title: Signalling Works Testing Handbook: Signalling Works Testing
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/A050 ISSUE 1
Title: Signalling Works Testing: Application of V&V Processes under Signalling Works Testing
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/A115 ISSUE 1
Title: Signalling Works Testing: Tester in Charge's Project Surveillance of Testers
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/A120 ISSUE 1
Title: Signalling Works Testing: Management and Control of Test Straps, Simulation Products and Test Instruments
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/B510 ISSUE 4
Title: Signalling Works Testing: Testing Management including the Appointment of Testers in Charge
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/C120 ISSUE 5
Title: Signalling Works Testing: Test Plans
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/C210 ISSUE 4
Title: Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/C310 ISSUE 5
Title: Signalling Works Testing: Check Marking and Recording on Test Copies
Organization: NR
Year: 2022
Status: Active
NR/L2/OHS/00127 ISSUE 2
Title: Road Fleet Compliance
Organization: NR
Year: 2022
Status: Active
NR/L2/HAM/02201 ISSUE 6
Title: Management of the Risk Arising from Deferred Renewals
Organization: NR
Year: 2022
Status: Active
NR/GN/RMVP/0200 ISSUE 2
Title: Infrastructure Plant Manual Guidance
Organization: NR
Year: 2022
Status: Active
NR/GN/SIG/19054 ISSUE 3
Title: SSI Technicians' Manual
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/40045 ISSUE 7
Title: Electric Points Heating
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/018 ISSUE 2
Title: Dynamic Track Stabiliser (DTS) - Operation, Principles and Requirements of Use
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/6001 ISSUE 3
Title: Management of Track Problem Statements and the Track Refurbishment and Renewal Work Bank
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/7007 ISSUE 1
Title: Track Information Bulletin
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/151 ISSUE 7
Title: Application of Standard Designs and Details for Building and Civil Engineering Works
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/22001 ISSUE 2
Title: Procedures and Competence Requirements for Persons Undertaking Works Near High Voltage Cables and Cable Routes
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300 ISSUE 2
Title: Mobile Maintenance Train Operational Procedures
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/10064 ISSUE 11
Title: General Instructions to Staff Working on S&T Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/11303 ISSUE 9
Title: Signalling Installation
Organization: NR
Year: 2022
Status: Active
NR/L3/TEL/0092 ISSUE 6
Title: Process for the Application and Implementation of Planned Works Activities Across the Telecom Bearer, Circuits and Systems
Organization: NR
Year: 2022
Status: Active
NR/L3/TEL/30066 ISSUE 1
Title: Energisation of Fixed Radio Frequency Transmitter Systems
Organization: NR
Year: 2022
Status: Active
NR/L3/TEL/30187 ISSUE 1
Title: RSIT, Telecommunications, Signalling and E&P Firewall Configuration
Organization: NR
Year: 2022
Status: Active
NR/GN/SIG/19054-4 ISSUE 3
Title: SSI Technicians' Manual: Multi-Processor Module (MPM)
Organization: NR
Year: 2022
Status: Active
NR/GN/SIG/19054-9 ISSUE 3
Title: SSI Technicians' Manual: Long Distance Terminal (LDT)
Organization: NR
Year: 2022
Status: Active
NR/GN/SIG/19054-10 ISSUE 3
Title: SSI Technicians' Manual: Technician's Terminal (MkII TT)
Organization: NR
Year: 2022
Status: Active
NR/GN/SIG/19054-13 ISSUE 1
Title: SSI Technicians' Manual: Technician's Terminal (MT04 TT)
Organization: NR
Year: 2022
Status: Active
TWI 2T014 ISSUE 2
Title: Manual Lift and Pack in S&C
Organization: NR
Year: 2022
Status: Active
TWI3C039 ISSUE 1
Title: How to Inspect, Maintain and Replace FFU Synthetic Longitudinal Bearer Systems
Organization: NR
Year: 2022
Status: Active
TWI3C040 ISSUE 1
Title: How to Store, Handle, Install and Maintain Sicut Composite Plain Line Sleepers
Organization: NR
Year: 2022
Status: Active
TWI3T047 ISSUE 1
Title: OTM Treatment of HPSS
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/40045/MODA ISSUE 1
Title: Electric Points Heating: Product Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P100 ISSUE 4
Title: Infrastructure Plant Manual: Reporting and Investigation of Plant Related Events
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P101 ISSUE 4
Title: Infrastructure Plant Manual: Monitoring Plant Activities
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P515 ISSUE 4
Title: Infrastructure Plant Manual: Portable and Transportable Plant
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P700 ISSUE 4
Title: Infrastructure Plant Manual: Plant Maintenance
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/50035/MOD07 ISSUE 1
Title: Competence Standard Module: Competence and Training for the Competence Framework; CCS Signal Maintenance Testing
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/50035/MOD40 ISSUE 1
Title: Competence Standard Module: Competence and Training for the Competence Framework; Non-Technical Skills
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/018/01 ISSUE 1
Title: Dynamic Track Stabiliser (DTS) - Operation and Principles of Use
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/018/02 ISSUE 1
Title: Dynamic Track Stabiliser (DTS) - Requirements for the Use of Dynamic Track Stabiliser (DTS)
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/151/01 ISSUE 1
Title: Index of Standard Designs and Details for Building and Civil Engineering Works
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/22001/01 ISSUE 1
Title: Procedure for Persons Working Near High Voltage Cables and Cable Routes in Southern Region Only
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/22001/02 ISSUE 1
Title: Procedure for Persons Working Near High Voltage Cables and Cable Routes for Use in all Regions/Routes, Except Southern Region
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/22001/03 ISSUE 1
Title: Interim Competence Process for Persons Assessing and Controlling Risks for Work Near High Voltage Cables and Cable Routes
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD02 ISSUE 6
Title: Working On or About 25 kV A.C. Electrified Lines: Assessment of Electrical Risks
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P102 ISSUE 4
Title: Infrastructure Plant Manual: Plant Occupational Health
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P300 ISSUE 5
Title: Infrastructure Plant Manual: Plant Approval and Design
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P301 ISSUE 4
Title: Infrastructure Plant Manual: Road Rail Access Points (RRAP)
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P500 ISSUE 4
Title: Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P501 ISSUE 5
Title: Infrastructure Plant Manual: Systems of Work
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P503 ISSUE 5
Title: Infrastructure Plant Manual: Lifting Operations
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P505 ISSUE 4
Title: Infrastructure Plant Manual: Safe Working with Plant
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P506 ISSUE 4
Title: Infrastructure Plant Manual: On-Track Machines
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P508 ISSUE 4
Title: Infrastructure Plant Manual: Mobile Elevating Work Platforms (MEWPs)
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P509 ISSUE 4
Title: Infrastructure Plant Manual: Trailers and Wheeled Attachments
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P511 ISSUE 4
Title: Infrastructure Plant Manual: Vegetation Management
Organization: NR
Year: 2022
Status: Active
NR/L2/RMVP/0200/P513 ISSUE 4
Title: Infrastructure Plant Manual: Mobile Plant (Non-Rail Mounted) and Road Vehicles
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD03 ISSUE 6
Title: Working on or About 25 kV A.C. Electrified Lines: Management of Electrical Risks
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD04 ISSUE 7
Title: Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
Organization: NR
Year: 2022
Status: Inactive
NR/L3/ELP/29987/MOD05 ISSUE 6
Title: Working on or About 25 kV A.C. Electrified Lines: Particular Actions to be Taken by the Infrastructure Maintainer
Organization: NR
Year: 2022
Status: Inactive
NR/L3/OPS/045/3.21 ISSUE 2
Title: National Operating Procedure (NOP) 3.21: Asset Monitoring Systems Wheel Impact Load Detector (WILD) and Hot Axle Box Detector (HABD)
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/314/T01 ISSUE 2
Title: Engineering Assurance for T&RS, OTM and OTP Projects: Technical Review Form
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/314/T02 ISSUE 2
Title: Engineering Assurance for T&RS, OTM and OTP Projects: Technical Change Proposal Form
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/10064/GI/B001 ISSUE 4
Title: General Instructions to Staff Working on S&T Equipment: Work that Could Affect the Operation of Signalling Equipment, but Can Be Carried Out between Trains
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/10064/GI/B002 ISSUE 4
Title: General Instructions to Staff Working on S&T Equipment: Disconnections - During Failures or to Work on S&T Equipment or the Release of Controls
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/10064/GI/T001 ISSUE 4
Title: General Instructions to Staff Working on S&T Equipment: Testing - General
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/10064/GI/U033 ISSUE 4
Title: General Instructions to Staff Working on S&T Equipment: Use of Monitoring and Test Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/10064/GI/U034 ISSUE 4
Title: General Instructions to Staff Working on S&T Equipment: Management and Control of Straps
Organization: NR
Year: 2022
Status: Active
NR/SMTH/PART 06 ISSUE 7
Title: Signal Maintenance Testing Handbook (SMTH): Part 06
Organization: NR
Year: 2022
Status: Active
NR/SMTH/PART 10 ISSUE 2
Title: Signal Maintenance Testing Handbook (SMTH): Part 10
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/11303/2X35 ISSUE 1
Title: Signalling Installation: Installing and Aligning the Schweizer Miniature Stop Light Unit
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/07 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: Site Inspection, Verification & Mark Up
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/09 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: Preparation of MMT, Handover and Hand-Back of Control of the MMT
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/10 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: A50 Control Desk Operation
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/11 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: MMT Working in Section
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/12 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: MMT Working out-of-gauge
Organization: NR
Year: 2022
Status: Active
NR/SIN/208 ISSUE 1
Title: Survey and Correlation of IP Connected Signalling and Telecoms Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/ME0300/14 ISSUE 1
Title: Mobile Maintenance Train Operational Procedures: MMT Working in a Structure
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/RCS0216/MP01 ISSUE 5
Title: Risk Control Manual: Use & Control of On Track Plant (OTP)
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/RCS0216/MP07 ISSUE 3
Title: Risk Control Manual: Use of OTP with Attachments
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/14 ISSUE 1
Title: Design and Construction in a High Street Environment: System Definition for The Public Realm (Squares and Plazas Outside Railway Stations)
Organization: NR
Year: 2022
Status: Active
NR/SMS/PART/D ISSUE 15
Title: Signal Maintenance Specifications (SMS): PART D
Organization: NR
Year: 2022
Status: Active
NR/SMS/PART/E ISSUE 12
Title: Signal Maintenance Specifications (SMS): PART E
Organization: NR
Year: 2022
Status: Active
NR/SMS/PART/T ISSUE 9
Title: Signal Maintenance Specifications (SMS): PART T
Organization: NR
Year: 2022
Status: Active
TEF 3302 ISSUE 2
Title: Identification of Structures for DTS Approval
Organization: NR
Year: 2023
Status: Active
TEF 3303 ISSUE 1
Title: Review of Assets for DTS Approval
Organization: NR
Year: 2022
Status: Active
TEF 3304 ISSUE 1
Title: Outline Problem Statement Form for Plain Line
Organization: NR
Year: 2022
Status: Active
TEF 3305 ISSUE 1
Title: Outline Problem Statement Form for S&C
Organization: NR
Year: 2022
Status: Active
B00108 ISSUE 1
Title: Single and Double Line Block Typical Circuits - Electric Token Working - With Remote Release and/or Within MAS Area
Organization: NR
Year: 2022
Status: Active
B00109 ISSUE 1
Title: Single and Double Line Block Typical Circuits - Electric Key Token - Starting Signal Release Options
Organization: NR
Year: 2022
Status: Active
R00020 ISSUE 8
Title: Route Relay Interlocking, Typical Circuits - General Notes 1
Organization: NR
Year: 2022
Status: Active
R00021 ISSUE 2
Title: Route Relay Interlocking, Typical Circuits - General Notes 2
Organization: NR
Year: 2022
Status: Active
T00020 ISSUE 8
Title: Lineside and On-Track Equipment Typical Circuits - General Notes 1
Organization: NR
Year: 2022
Status: Active
B00101 ISSUE 3
Title: Single and Double Line Block Typical Circuits - Electric Token Working - Typical Token Circuit Configuration and Generic Notes
Organization: NR
Year: 2022
Status: Active
B00102 ISSUE 2
Title: Single and Double Line Block Typical Circuits - Electric Token Working - Intermediate Token Instruments Internal Wiring
Organization: NR
Year: 2022
Status: Active
B00103 ISSUE 1
Title: Single and Double Line Block Typical Circuits - Electric Token Working - No Signaller Remote Operator (NST No Signaller Token)
Organization: NR
Year: 2022
Status: Active
B00106 ISSUE 1
Title: Single and Double Line Block Typical Circuits - Electric Token Working - No Signaller Token with Remote Crossing Loops - NSTR Token Instrument Circuits
Organization: NR
Year: 2022
Status: Active
B00107 ISSUE 1
Title: Single and Double Line Block Typical Circuits - Electric Token Working - NSTR Transmission Related Circuits and Power Supply Indications
Organization: NR
Year: 2022
Status: Active
T00021 ISSUE 2
Title: Lineside and On-Track Equipment Typical Circuits - General Notes 2
Organization: NR
Year: 2022
Status: Active
T25950 ISSUE 8
Title: Lineside & on Track Equipment Typical Circuits - Points - Battery Power Supply
Organization: NR
Year: 2022
Status: Active
TIB 02 ISSUE 1
Title: Scarf Joints - Suspension of Installation and Ultrasonic Testing
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/05/F01 ISSUE 2
Title: Design and Construction Management in a High Street Environment: Car Park Away from Track, Does Not Service Station - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30017 ISSUE 3
Title: Requirements for Level Crossings
Organization: NR
Year: 2022
Status: Active
NR/L2/XNG/30020/A27 ISSUE 1
Title: Level Crossings Design Handbook: Requirements for Gates and Stiles at Level Crossings
Organization: NR
Year: 2022
Status: Active
NR/L2/XNG/30020/R01 ISSUE 1
Title: Level Crossings Design Handbook: General Requirements for Level Crossings
Organization: NR
Year: 2022
Status: Active
NR/L2/XNG/30020/R03 ISSUE 1
Title: Level Crossings Design Handbook: Requirements for Station, Footpath, Bridleway and User-Worked Level Crossings
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/12/F01 ISSUE 2
Title: Design and Construction Management in a High Street Environment: Generic Roof / Canopy Away from Track - Diagram
Organization: NR
Year: 2022
Status: Active
NR/L3/OHS/005/14/F01 ISSUE 1
Title: Design and Construction Management in a High Street Environment: System Definition for The Public Realm (Squares and Plazas Outside Railway Stations) - Diagram
Organization: NR
Year: 2022
Status: Active
NR/SIN/209 ISSUE 1
Title: Regulatory Requirements for PCB Contaminated Equipment
Organization: NR
Year: 2022
Status: Inactive
NR/L2/SIG/30009/E710 ISSUE 4
Title: Signalling Principles Handbook: Provision of Flank Protection
Organization: NR
Year: 2022
Status: Active
NB 212 ISSUE 1
Title: Permissive Working when using Automatic Route Setting Systems
Organization: NR
Year: 2022
Status: Active
NB 161 ISSUE 2
Title: QMT2 Motor and Micronome Electronic Timers
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/20047 ISSUE 3
Title: Management of Safety Related Reports for Signalling Failures Appendix
Organization: NR
Year: 2022
Status: Inactive
TI 000 ISSUE 36
Title: Current Index of Technical Instructions Contained in NR/L2/SIG/11120
Organization: NR
Year: 2022
Status: Active
NR/SIN/210 ISSUE 1
Title: Investigation into the Diversity for Critical Signalling Services Provided over FTN and FTNx
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/168 ISSUE 3
Title: Asbestos Management
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/171 ISSUE 3
Title: Examinations, Inspections and Assessments of Buildings & Architecture Assets: Structures and Fabric
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/172 ISSUE 2
Title: Buildings and Architecture: Instructing Reactive, Minor Emerging Works and Business Plan Interventions
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/1007 ISSUE 4
Title: Specification for 25 kV A.C. Disconnectors, Earthing Switches and Switches
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/21085 ISSUE 6
Title: Earthing and Bonding on A.C. Electrified Railways
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/27224 ISSUE 3
Title: Specification for Installation of Cable Routes Forming Part of the Traction Distribution System (aka NR/SP/ELP/27224)
Organization: NR
Year: 2022
Status: Active
NR/L2/OTK/5100 ISSUE 5
Title: Boundary Measure Management Manual
Organization: NR
Year: 2022
Status: Active
NR/L2/SCT/003 ISSUE 1
Title: Security Competence Framework
Organization: NR
Year: 2022
Status: Active
NR/L2/TEL/30130 ISSUE 4
Title: Customer & Operational Information Systems
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/1054 ISSUE 6
Title: Inspection and Maintenance Procedures for Crossings in Track
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/10027 ISSUE 5
Title: Surveillance of Signal Maintenance Activities
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/065 ISSUE 7
Title: Examination of Earthworks Manual
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/27720 ISSUE 1
Title: Test Before Touch for Overhead Line Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/MG0173 ISSUE 4
Title: Monitoring of Spoken Safety Communications
Organization: NR
Year: 2022
Status: Active
NR/L3/SIG/19810 ISSUE 3
Title: Signal Engineering Involvement in Track and Civil Engineering Work
Organization: NR
Year: 2022
Status: Active
NR/L3/TEL/30162 ISSUE 3
Title: Work Instruction for Jointing, Terminating, and Testing Optical Fibre Cables
Organization: NR
Year: 2022
Status: Active
NR/L3/TRK/7006 ISSUE 3
Title: Creation and Application of an Emergency Speed Restriction (ESR) Design
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/065/MOD03 ISSUE 1
Title: Examination of Earthworks Guidance Manual: Rock Cuttings
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/200/05 ISSUE 1
Title: Station Design Manual: Vertical Circulation
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/300/05 ISSUE 1
Title: Compliance Design Manual: Rail Symbol 2
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/1000/01 ISSUE 1
Title: Competence Management for Drainage and Lineside
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/1000/02 ISSUE 1
Title: Competence Management for Structures
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/1000/03 ISSUE 1
Title: Competence Management for Tunnels
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/1000/04 ISSUE 1
Title: Competence Management for Earthworks
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/1000/05 ISSUE 1
Title: Competence Management for Buildings
Organization: NR
Year: 2022
Status: Active
NR/L2/OTK/5100/MOD01 ISSUE 5
Title: Boundary Measure Management Manual: Boundary Measure Inspection and Evaluation
Organization: NR
Year: 2022
Status: Active
NR/L2/OTK/5100/MOD03 ISSUE 2
Title: Boundary Measure Management Manual: Boundary Measure Specification
Organization: NR
Year: 2022
Status: Active
SSI8003-10D ISSUE 4
Title: SSI Interlocking - Data Files Source Language
Organization: NR
Year: 2022
Status: Active
SSI8003-10E ISSUE 10
Title: SSI Interlocking - IPT, PFM and PRR Files
Organization: NR
Year: 2022
Status: Active
SSI8003-51C ISSUE 12
Title: Communications with Other Interlockings: Chapter C: Route Locking Across Boundaries
Organization: NR
Year: 2022
Status: Active
SSI8003-52 ISSUE 9
Title: Timing Constraints on Interlocking Data Complexity
Organization: NR
Year: 2022
Status: Active
SSI8003-54 ISSUE 9
Title: Data/Compiler/Program Compatibility
Organization: NR
Year: 2022
Status: Active
SSI8003-63 ISSUE 11
Title: SSI Data Preparation: Route Class Selection and Overlap Releasing
Organization: NR
Year: 2022
Status: Active
SSI8003-66 ISSUE 10
Title: Restoration of Points
Organization: NR
Year: 2022
Status: Active
SSI8003-85 ISSUE 4
Title: Robust Train Protection
Organization: NR
Year: 2022
Status: Active
SSI8003-86A ISSUE 1
Title: SSI Data Preparation - Overlaps: Table of Contents
Organization: NR
Year: 2022
Status: Active
SSI8003-86B ISSUE 1
Title: SSI Data Preparation - Overlaps: Principles and Simple Examples
Organization: NR
Year: 2022
Status: Active
SSI8003-86C ISSUE 1
Title: SSI Data Preparation - Overlaps: Facing and Trailing Points in Overlap
Organization: NR
Year: 2022
Status: Active
SSI8003-86D ISSUE 1
Title: SSI Data Preparation - Overlaps: Swinging Parallel Overlaps
Organization: NR
Year: 2022
Status: Active
SSI8003-86E ISSUE 1
Title: SSI Data Preparation - Overlaps: Opposing Overlaps
Organization: NR
Year: 2022
Status: Active
SSI8003-86F ISSUE 1
Title: SSI Data Preparation - Overlaps: Multiple Facing Points in an Overlap
Organization: NR
Year: 2022
Status: Active
SSI8003-86G ISSUE 1
Title: SSI Data Preparation - Overlaps: Swinging Full and Restricted Overlaps
Organization: NR
Year: 2022
Status: Active
SSI8003-86H ISSUE 1
Title: SSI Data Preparation - Overlaps: Cross-Boundary Swinging Overlaps
Organization: NR
Year: 2022
Status: Active
SSI8003-86I ISSUE 1
Title: SSI Data Preparation - Overlaps: Mandatory Data Checks
Organization: NR
Year: 2022
Status: Active
SSI8003-92 ISSUE 2
Title: Obsolescent Data
Organization: NR
Year: 2022
Status: Active
SSI8505-C ISSUE 5
Title: Data Production
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/19820/L01 ISSUE 1
Title: Signalling and Level Crossing Product Specifications: Specification for EULYNX - Generic
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/19820/L02 ISSUE 1
Title: Signalling and Level Crossing Product Specifications: Specification for EULYNX - Train Detection System (TDS)
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/19820/L03 ISSUE 1
Title: Signalling and Level Crossing Product Specifications: Specification for EULYNX Interface - Points
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/19820/L04 ISSUE 1
Title: Signalling and Level Crossing Product Specifications: Specification for EULYNX - Level Crossing
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/19820/L05 ISSUE 1
Title: Signalling and Level Crossing Product Specifications: Specification for EULYNX - Interlocking to Adjacent Interlocking Subsystem (ILS)
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS3-01 ISSUE 6
Title: Signalling Works Testing Handbook: Cable Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS4-01 ISSUE 4
Title: Signalling Works Testing Handbook: Equipment Housing Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS5-55 ISSUE 2
Title: Signalling Works Testing Handbook: Thales AzLM Axle Counter Evaluator (ACE) Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS6-11 ISSUE 5
Title: Signalling Works Testing Handbook: Mechanically Operated Point End Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS7-01 ISSUE 4
Title: Signalling Works Testing Handbook: Filament or LED Type Signal Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS7-11 ISSUE 4
Title: Signalling Works Testing Handbook: Semaphore Signal Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS8-01 ISSUE 7
Title: Signalling Works Testing Handbook: AWS Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS8-11 ISSUE 7
Title: Signalling Works Testing Handbook: TPWS Standard Fitment Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS9-01 ISSUE 4
Title: Signalling Works Testing Handbook: Operator's Control and Indication Panel Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS10-10 ISSUE 2
Title: Signalling Works Testing Handbook: Block System Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/30014/D120/TS17-51 ISSUE 3
Title: Signalling Works Testing Handbook: Integration Testing - Correspondence Signalling Works Test Specification
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/50035/MOD09 ISSUE 1
Title: Competence Standard Module: Competence and Training for the Competence Framework; CCS Signal Intermediate Testing
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/1054/01 ISSUE 1
Title: Inspection and Maintenance Procedures for Crossings in Track: Inspections of Crossings in Track
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/1054/02 ISSUE 1
Title: Inspection and Maintenance Procedures for Crossings in Track: Crossing Defects and Minimum Action Tables
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/006/3A ISSUE 4
Title: Structures, Tunnels and Operational Property Examinations: Examination of Operational Property Structures and Fabric
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/006/3G ISSUE 2
Title: Structures, Tunnels and Operational Property Examinations: Examination of Operational Property Structures, Fabric and M&E - Reporting and Recording of Examinations in Citadel
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/27720/01 ISSUE 1
Title: Test Before Touch for Overhead Line Equipment: Method 1: Dynamic Decision-Making for Test Before Touch Actions
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/27720/02 ISSUE 1
Title: Test Before Touch for Overhead Line Equipment: Method 2: Pre-Planned and Pre-Documented Test Before Touch Actions
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/27720/03 ISSUE 1
Title: Test Before Touch for Overhead Line Equipment: Method 3: A Pre-Planned and Pre-Documented Reduced Set of Test Before Touch Actions
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/27720/04 ISSUE 1
Title: Test Before Touch for Overhead Line Equipment: Method 4: A Test Before Touch Action Prior to Every Occasion Where It Is Planned to Touch a Conductor
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD04 ISSUE 8
Title: Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD05 ISSUE 7
Title: Working on or About 25 kV A.C. Electrified Lines: Particular Actions to Be Taken by the Infrastructure Maintainer
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD06 ISSUE 8
Title: Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD08 ISSUE 7
Title: Working on or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD09 ISSUE 7
Title: Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD10 ISSUE 8
Title: Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD11 ISSUE 7
Title: Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD12 ISSUE 7
Title: Working on or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD X ISSUE 5
Title: Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD Y ISSUE 4
Title: Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/29987/MOD Z ISSUE 2
Title: Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sunderland 1500V d.c. Overhead Electrified Lines
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/RCS0216/SIG03 ISSUE 3
Title: Risk Control Manual: Working on Train Detection, Track Circuits & Bonds
Organization: NR
Year: 2022
Status: Active
NR/L3/MTC/RCS0216/SIG05 ISSUE 3
Title: Risk Control Manual: Working on Electrical Apparatus (Relay Rooms, REBs & IECCs Location Cases)
Organization: NR
Year: 2022
Status: Active
NR/L3/OPS/045/3.38 ISSUE 1
Title: National Operating Procedure (NOP) 3.38: Signaller's Decision Points for User Worked Crossing Plus Telephone (UWC(T))
Organization: NR
Year: 2022
Status: Active
NR/L3/OPS/045/4.10 ISSUE 4
Title: National Operating Procedure (NOP) 4.10: Emergency Services Personnel On or Near the Line
Organization: NR
Year: 2022
Status: Active
TEF 3300 ISSUE 2
Title: Crossing Inspection Risk Assessment
Organization: NR
Year: 2023
Status: Active
TIB 01 ISSUE 1
Title: Track Circuit Occupied Risk with Aluminium Track Gauges Fitted with Metallic P8 Profile
Organization: NR
Year: 2022
Status: Active
TIB 03 ISSUE 1
Title: Identification of Broken Fastclips
Organization: NR
Year: 2022
Status: Active
TIB 04 ISSUE 1
Title: CEN33 Check Rail for NR60/RT60 Layouts
Organization: NR
Year: 2022
Status: Active
TIB 05 ISSUE 1
Title: Concrete Bearer Tie Assembly Parts Fe6 Double Coil Spring Washer 057/077056
Organization: NR
Year: 2022
Status: Active
NR/SIN/211 ISSUE 1
Title: Security of Frauscher Wheel Sensors Associated with Vamos Level Crossings
Organization: NR
Year: 2022
Status: Inactive
NR/L2/OHS/501/P1 ISSUE 2
Title: Trackworker Protection and Warning Systems: Module P1: Track Circuit Operating Device (TCOD)
Organization: NR
Year: 2022
Status: Active
NR/L2/SCO/310 ISSUE 1
Title: Control of Movements in Depots, Yards and Associated Depot Sidings (Methods of Work)
Organization: NR
Year: 2022
Status: Active
NR/L2/SCO/315 ISSUE 1
Title: Controls for The Management of Long Welded Rail Delivery and Recovery
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/10158/MOD04 ISSUE 1
Title: Specification for Signal Sighting Assessment: Signals - Configuration, Specification and Managing Readability Factors
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-2.04/AB ISSUE 3
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Mobile Communications and Personal Electronic Devices Brief Acknowledgement Form
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-2.04 ISSUE 3
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Personal Electronic Devices Protocol
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-3.04 ISSUE 3
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual: Managing OTM Incidents
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-3.05 ISSUE 4
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual: Chain of Care
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-3.06 ISSUE 4
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual - General OTM Driver Operators Management Instructions
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-2.04/AA ISSUE 3
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Mobile Communications and Personal Electronic Devices Brief
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-2.04/AC ISSUE 3
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual: Non-OTM Crew/Safety Critical Staff or Manager, Mobile Communications and Personal Electronic Devices Brief
Organization: NR
Year: 2022
Status: Active
NR/L3/SCO/313/SP-2.05/AA ISSUE 8
Title: On-Track Machines (OTMs) Driver and Operations Standards Manual: Defective OTM On-Train Equipment - List of OTM Equipment and Actions to Be Taken
Organization: NR
Year: 2022
Status: Active
NB 213 ISSUE 1
Title: Pandrol Vortok AWS Fitment to RFF
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/074 ISSUE 2
Title: Design and Installation of Overhead Line Foundations
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/193 ISSUE 2
Title: Standard Specification for New and Upgraded Lifts
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/27401 ISSUE 2
Title: Configuration Management & Change to Protection & Control Systems
Organization: NR
Year: 2022
Status: Active
NR/L2/MTC/MG0040 ISSUE 1
Title: Management of Maintenance Process Definitions
Organization: NR
Year: 2022
Status: Active
NR/L2/OHS/CP0070 ISSUE 6
Title: Principal Contractor Licensing Assurance (formerly NR/L2/INI/CP0070)
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/220 ISSUE 2
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Integration
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/225 ISSUE 2
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Assurance
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/222 ISSUE 2
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Time
Organization: NR
Year: 2022
Status: Active
NR/L2/CIV/095 ISSUE 2
Title: Asset Protection and Optimisation Management of Third Party Works on Network Rail Infrastructure
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/27238 ISSUE 10
Title: Maintenance Specification for Fixed Plant Equipment
Organization: NR
Year: 2022
Status: Active
NR/L2/INF/02203 ISSUE 3
Title: Controlled Publications - Issue and Receipt
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/039 ISSUE 1
Title: Composite Sleepers, Bearers and Longitudinal Bridge Systems
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/194 ISSUE 2
Title: Selection and Design of New and Upgraded Lifts
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/102 ISSUE 4
Title: Investment Decision Framework (aka NR/L2/INI/P3M/102)
Organization: NR
Year: 2022
Status: Active
NR/L3/TRK/1020 ISSUE 1
Title: Track Hand Back for Projects: Confirming Track Is Safe for Opening at the Selected Line Speed After Projects Engineering Work
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/221 ISSUE 2
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Scope
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/224 ISSUE 2
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Risk
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/053 ISSUE 10
Title: Inspection and Repair to Control the Risk of Derailment at Switches
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/00012 ISSUE 3
Title: Management of Road Vehicle Incursions (RVI)
Organization: NR
Year: 2022
Status: Active
NR/L3/ELP/27241 ISSUE 6
Title: Fixed Plant Work Instructions
Organization: NR
Year: 2022
Status: Active
NR/L3/TRK/055 ISSUE 5
Title: Work Instructions for Ultrasonic Rail Testing
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/200/02 ISSUE 1
Title: Station Design Manual: Design Manual for Medium to Small Stations
Organization: NR
Year: 2022
Status: Active
NR/L2/ELP/27238/APP-L ISSUE 7
Title: Maintenance Specification for Fixed Plant Equipment: Maintenance and Inspection Specification for Lifting Equipment
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/224/MOD02 ISSUE 1
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Risk - Managing Contingency on Capital Investment Projects
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/11201/MOD A2-9 ISSUE 2
Title: Signalling Design Handbook: Functionally Equivalent Design
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/50035/20 ISSUE 1
Title: Competence Standard Module: Competence and Training for the Competence Framework; CCS Signal Professional Engineering
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/053/MOD01 ISSUE 4
Title: Inspection and Repair to Control the Risk of Derailment at Switches: Module 1: Glossary and Tooling
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/053/MOD03 ISSUE 4
Title: Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Repair of Switches
Organization: NR
Year: 2022
Status: Active
NR/L3/CIV/00012/01 ISSUE 1
Title: Road Vehicle Incursions: Risk Assessment of Public and Non-Public Bridge and Neighbouring Sites
Organization: NR
Year: 2022
Status: Active
NR/FP C600 ISSUE 1
Title: Fixed Plant Work Instructions: Maintenance and Thorough Examination of Polecat Level Crossing CCTV Winch Gear
Organization: NR
Year: 2022
Status: Active
NR/L3/TRK/055/U15 ISSUE 4
Title: Work Instructions for Ultrasonic Rail Testing: Ultrasonic Testing of Rail Using a Roller Search Unit Including Identification & Sizing of 37 deg/40 deg Suspects Reported by the UTU
Organization: NR
Year: 2022
Status: Active
NR/GN/CIV/300/01 ISSUE 2
Title: Compliance Design Manual: Wayfinding
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/224/MOD01 ISSUE 2
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Risk - Quantitative Risk Assessment (QRA)
Organization: NR
Year: 2022
Status: Active
NR/L2/P3M/225/MOD01 ISSUE 1
Title: Project Acceleration in a Controlled Environment (PACE) - Manage Assurance - Project Assurance
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/11201/MOD X15 ISSUE 1
Title: Signalling Design Handbook: Level Crossings: Automatic Full Barrier Crossing Locally Monitored
Organization: NR
Year: 2022
Status: Active
NR/L2/SIG/50035/25 ISSUE 1
Title: Competence Standard Module: Competence and Training for the Competence Framework; CCS Signal Tools & Methods
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/053/MOD02 ISSUE 5
Title: Inspection and Repair to Control the Risk of Derailment at Switches: Module 2: Inspection
Organization: NR
Year: 2022
Status: Active
NR/L2/TRK/053/MOD04 ISSUE 4
Title: Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information
Organization: NR
Year: 2022
Status: Active
NR/FP A001 ISSUE 6
Title: Fixed Plant Work Instructions Index
Organization: NR
Year: 2022
Status: Active
NR/L3/OPS/021/09 ISSUE 2
Title: Weather Management Index: Management of Structures During Adverse and Extreme Weather
Organization: NR
Year: 2022
Status: Active
TEF 3306 ISSUE 1
Title: Certificate of Competence Hand Back Engineer Levels 1 to 4
Organization: NR
Year: 2022
Status: Active
NR/L3/TRK/055/U17 ISSUE 2
Title: Work Instructions for Ultrasonic Rail Testing: Ultrasonic Testing of the Rail Foot for Transverse Cracks Under the Web Using a Roller Search Unit
Organization: NR
Year: 2022
Status: Active
NR/L3/TRK/055/U16 ISSUE 2
Title: Work Instructions for Ultrasonic Rail Testing: Ultrasonic Testing of Holes and Rail Ends - Using a Roller Search Unit
Organization: NR
Year: 2022
Status: Active
NB 214 ISSUE 1
Title: Automatic Warning System Strength and Polarity Indicator
Organization: NR
Year: 2022
Status: Active
NB 208 ISSUE 2
Title: Solid State Interlocking (SSI) Obsolescence
Organization: NR
Year: 2022
Status: Active
NB 215 ISSUE 1
Title: Frauscher Wheel Sensor RSR123
Organization: NR
Year: 2022
Status: Active
NB 216 ISSUE 1
Title: Targeted Level Crossing Renewals
Organization: NR
Year: 2022
Status: Active
NR/L3/OPS/045/4.01 ISSUE 4
Title: National Operating Procedure (NOP) 4.01: Evacuation and Security Management of Signalling Locations, Controls, Stations and Trains
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/00120 ISSUE 7
Title: Drugs, Alcohol and Substance Misuse in the Workplace
Organization: NR
Year: 2023
Status: Active
NB 217 ISSUE 1
Title: IRSE Licence Requirements
Organization: NR
Year: 2023
Status: Active
NB 202 ISSUE 2
Title: Power Loading Values for POE
Organization: NR
Year: 2023
Status: Active
NR/SIN/205 ISSUE 3
Title: Survey of Small (16mm) Core WT Henley Insulator
Organization: NR
Year: 2023
Status: Inactive
NR/GN/SIG/CAT005 ISSUE 58
Title: Index of Network Rail Documents Relating to Signalling and Communications Equipment
Organization: NR
Year: 2023
Status: Active
NR/L1/SCT/002 ISSUE 1
Title: Cyber Security and Resilience for Digital Systems
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/076 ISSUE 1
Title: Management of Bridge Strikes
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/902 ISSUE 1
Title: Electric Vehicle Charging Points and Associated Infrastructure
Organization: NR
Year: 2023
Status: Active
NR/L2/ELP/21131 ISSUE 4
Title: Warning and Other Signs for A.C. and D.C. Electrified Lines
Organization: NR
Year: 2023
Status: Active
NR/L2/ELP/27717 ISSUE 1
Title: Bridge Parapet Electrical Risk Assessment
Organization: NR
Year: 2023
Status: Active
NR/L2/ELP/27722 ISSUE 1
Title: Protection Principles for A.C. Electrified Railways
Organization: NR
Year: 2023
Status: Active
NR/L2/ENV/122 ISSUE 2
Title: Biodiversity
Organization: NR
Year: 2023
Status: Active
NR/L2/MTC/10662 ISSUE 13
Title: Process for the Creation of New or Revised Maintenance Regimes Using Reliability Centred Maintenance (RCM)
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/501 ISSUE 7
Title: Trackworker Protection and Warning Systems
Organization: NR
Year: 2023
Status: Active
NR/L2/OPS/207 ISSUE 1
Title: Training and Competence in Engineering Access Planning (formerly NR/L2/CTM/207 - Competence and Training in Isolation Planning)
Organization: NR
Year: 2023
Status: Active
NR/L2/RSE/02009 ISSUE 8
Title: Engineering Management for Projects
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/10047 ISSUE 17
Title: Management of Safety Related Signalling and Telecoms Equipment System Failures
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/50019 ISSUE 5
Title: Control of the Issue of S&T Keys from Network Rail
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/0132 ISSUE 8
Title: Maintenance Arc Welding of Rails, Switches and Crossings
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/3415 ISSUE 3
Title: Refurbishment of Switches and Crossings (aka NR/L3/TRK/3415)
Organization: NR
Year: 2023
Status: Active
NR/L3/CIV/006 ISSUE 11
Title: Structures, Tunnels and Operational Property Examinations
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052 ISSUE 8
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line
Organization: NR
Year: 2023
Status: Active
NR/L3/INF/02222 ISSUE 2
Title: Metadata for Documents and Records
Organization: NR
Year: 2023
Status: Active
NR/L3/OPS/021 ISSUE 7
Title: Weather Management Index
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235 ISSUE 2
Title: Signalling Intermediate Testing Handbook
Organization: NR
Year: 2023
Status: Active
NR/L3/TRK/1015 ISSUE 8
Title: Management of Basic Visual Inspection
Organization: NR
Year: 2023
Status: Active
NR/L3/TRK/9022 ISSUE 2
Title: Weld Procedure Specifications
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/001/MOD14 ISSUE 8
Title: Inspection and Maintenance of Permanent Way: Managing Track in Hot Weather
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/903 ISSUE 1
Title: Buildings & Civils Engineering Advice Notes
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/501/W4 ISSUE 2
Title: Trackworker Protection and Warning Systems: Module W4: Geofencing and Geotagging Devices
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/10047/01 ISSUE 1
Title: Management of Safety Related Signalling and Telecoms Equipment System Failures: Managing Safety Related Failures and Incidents of Signalling & Telecoms Equipment
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/076/02 ISSUE 1
Title: Management of Bridge Strikes: Actions to Be Taken Following Bridge Strike Incidents
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/10047/03 ISSUE 1
Title: Management of Safety Related Signalling and Telecoms Equipment System Failures: Signalling Hazard and Risk Ratings
Organization: NR
Year: 2023
Status: Active
NR/L2/MTC/10662/05 ISSUE 2
Title: Process for the Creation of New or Revised Maintenance Regimes Using Reliability Centred Maintenance (RCM): Track end to end process
Organization: NR
Year: 2023
Status: Active
NR/L3/TEL/30181/030 ISSUE 1
Title: Telecoms Maintenance Work Instructions Handbook: Maintenance of Hi-Path
Organization: NR
Year: 2023
Status: Active
NR/L1/SIG/50021/05 ISSUE 1
Title: Signalling Asset Policy: System Definition
Organization: NR
Year: 2023
Status: Active
NR/L2/ENV/122/02 ISSUE 2
Title: Biodiversity: Habitat Management Plan
Organization: NR
Year: 2023
Status: Active
NR/GN/CIV/100/09 ISSUE 1
Title: Strategic Design Manual: Implementation Strategy for Medium to Small Stations
Organization: NR
Year: 2023
Status: Active
NR/L2/RSE/02009/01 ISSUE 3
Title: Engineering Management for Projects: Assessment for Project Engineering Roles
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/10047/05 ISSUE 1
Title: Management of Safety Related Signalling and Telecoms Equipment System Failures: Monitored Common Failures
Organization: NR
Year: 2023
Status: Active
NR/L3/OPS/021/08 ISSUE 2
Title: Weather Management Index: Management of Earthworks during Adverse and Extreme Weather
Organization: NR
Year: 2023
Status: Active
NR/L3/TEL/30181/031 ISSUE 1
Title: Telecoms Maintenance Work Instructions Handbook: Maintenance of TENOVIS
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/0132/03 ISSUE 2
Title: Maintenance Arc Welding of Rails, Switches and Crossings: Weld Repair of Switches
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/076/01 ISSUE 1
Title: Management of Bridge Strikes: Management of the Risk of Bridge Strikes from Road Vehicles and Waterborne Vessels
Organization: NR
Year: 2023
Status: Active
NR/L2/ENV/122/01 ISSUE 2
Title: Biodiversity: Management of Biodiversity
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052/03 ISSUE 3
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line: Isolation of Conductor Rails
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052/07 ISSUE 3
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line: Station Emergency Evacuation Instructions
Organization: NR
Year: 2023
Status: Active
NR/L3/TEL/30181/028 ISSUE 1
Title: Telecoms Maintenance Work Instructions Handbook: Maintenance of MD110
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/10047/02 ISSUE 1
Title: Management of Safety Related Signalling and Telecoms Equipment System Failures: Data Entry for S&TINCS
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052/06 ISSUE 3
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line: Shut Down Arrangements
Organization: NR
Year: 2023
Status: Active
NR/SMTH/PART 03 ISSUE 12
Title: Signal Maintenance Testing Handbook (SMTH): Part 03
Organization: NR
Year: 2023
Status: Active
NR/L3/TEL/30181/029 ISSUE 1
Title: Telecoms Maintenance Work Instructions Handbook: Maintenance of MX-ONE
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052/01 ISSUE 2
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line: Description of Electrification System
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/11201/MOD A5-3/APPENDIX K ISSUE 2
Title: Signalling Design Handbook: Signalling Control Tables - MCB-OD Level Crossings
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/501/P2 ISSUE 1
Title: Trackworker Protection and Warning Systems: Module P2: Remote Disconnection Device (RDD)
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/501/W2 ISSUE 3
Title: Trackworker Protection and Warning Systems: Module W2: Automatic Track Warning System (ATWS)
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052/05 ISSUE 3
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line: Engineering Work and Obstruction of the Line Within the Tunnel
Organization: NR
Year: 2023
Status: Active
X49999 ISSUE 2
Title: Level Crossing Typical Circuits Known Issues
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/CA1005 ISSUE 1
Title: Signalling Intermediate Testing Handbook: HW Point Machine Plug Coupled Cables Conversion
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/EL1041 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Installation of Intelligent Infrastructure Signalling Busbar Monitor
Organization: NR
Year: 2023
Status: Active
NR/L3/OPS/045/2.24 ISSUE 1
Title: National Operating Procedures Index: Mobile Operations Manager and Mobile Incident Officers Training and Competence Arrangements
Organization: NR
Year: 2023
Status: Active
NR/L3/TRK/1015/05 ISSUE 1
Title: Management of Basic Visual Inspection: Track Patrolling Including the Use of the Visual Inspection Unit
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/11201/MOD B20 ISSUE 2
Title: Signalling Design Handbook: Guidance for the Application of Temporary Speed Restriction (TSR) and Emergency Speed Restriction (ESR) Designs
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052/04 ISSUE 4
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line: Working of Trains
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/TC1003 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Installation of a TC Tail Cable Disconnection Box and Moulded Style TC Leads
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/CA1010 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Clamp Lock Moulded Cables Conversion
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/EL1042 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Installation of a New Lineside Disconnection Box
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/SG1064 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Renewal of Filament Type Signal to LED Type
Organization: NR
Year: 2023
Status: Active
NR/L3/CIV/006/1B ISSUE 4
Title: Structures, Tunnels and Operational Property Examinations: Undertake Examinations
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/TC1002 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Installation of a New BR Spec 867 Style TC Feed Set
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/ER1005 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Fitment of II RCM Power Supply (TRACO)
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/SG1071 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Installation of a Plug Coupled Type LED Signal Head
Organization: NR
Year: 2023
Status: Active
NR/L3/CIV/006/1A ISSUE 5
Title: Structures, Tunnels and Operational Property Examinations: Management of Examinations
Organization: NR
Year: 2023
Status: Active
NR/L3/CIV/006/1C ISSUE 7
Title: Structures, Tunnels and Operational Property Examinations: Management of Additional Examinations
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27052/02 ISSUE 3
Title: Working Instructions for D.C. Electrified Lines on the Northern City Line: General Instructions for Working On or Near Conductor Rail Equipment
Organization: NR
Year: 2023
Status: Active
NR/SMS/PART/A ISSUE 16
Title: Signal Maintenance Specifications (SMS): PART A
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/11235/G130/SG2001 ISSUE 1
Title: Signalling Intermediate Testing Handbook: Removal and Reinstatement of an Existing Speed Sign
Organization: NR
Year: 2023
Status: Active
BR 1925 ISSUE 1
Title: Terminal Processor Messages SSI
Organization: NR
Year: 1987
Status: Active
NR/GN/TRK/2500 ISSUE 1
Title: RE/PW/8000 Series Drawings
Organization: NR
Year: 2023
Status: Active
NR/L3/MTC/II0219/01 ISSUE 4
Title: Design, Configuration, Installation, Commissioning and Calibration of Intelligent Infrastructure Remote Condition Monitoring
Organization: NR
Year: 2023
Status: Active
NR/L3/MTC/II0219/02 ISSUE 4
Title: Management of Alerts and Alarms from Remote Condition Monitoring
Organization: NR
Year: 2023
Status: Active
NR/L3/MTC/II0219/03 ISSUE 4
Title: Maintenance of Assets Fitted with Remote Condition Monitoring
Organization: NR
Year: 2023
Status: Active
NR/L3/MTC/II0219 ISSUE 4
Title: Intelligent Infrastructure Remote Condition Monitoring Manual
Organization: NR
Year: 2023
Status: Active
NR/L2/MTC/CP008/01 ISSUE 2
Title: COVID-19 Works Contingency Plan: Prioritising Maintenance Activities
Organization: NR
Year: 2020
Status: Active
NR/L2/MTC/CP008/02 ISSUE 2
Title: COVID-19 Works Contingency Plan: The Definition of Essential Activities
Organization: NR
Year: 2020
Status: Active
NR/L2/MTC/CP008/03 ISSUE 2
Title: COVID-19 Works Contingency Plan: Route Category Levels
Organization: NR
Year: 2020
Status: Active
NR/L2/MTC/CP008/04 ISSUE 1
Title: COVID-19 Works Contingency Plan: Returning to a Full Operational Service
Organization: NR
Year: 2020
Status: Active
NR/L2/MTC/CP008 ISSUE 4
Title: COVID-19 Works Contingency Plan
Organization: NR
Year: 2020
Status: Active
NB 220 ISSUE 1
Title: SMART Links for Re-Signalling Projects
Organization: NR
Year: 2023
Status: Active
NR/SIN/212 ISSUE 1
Title: Application of Nord-Lock Washers with Frauscher Wheel Sensors Associated with Vamos Level Crossings
Organization: NR
Year: 2023
Status: Active
NB 178 ISSUE 3
Title: Apparatus Cases Cooling
Organization: NR
Year: 2023
Status: Active
NB 218 ISSUE 1
Title: Pandrol Vortok AWS Series 2
Organization: NR
Year: 2023
Status: Active
NB 219 ISSUE 1
Title: Security Assurance of Data Logging Systems
Organization: NR
Year: 2023
Status: Active
NB 222 ISSUE 1
Title: Premature Failure of Battery Packs
Organization: NR
Year: 2023
Status: Active
NB 223 ISSUE 1
Title: Single Arm Temporary AWS Magnets
Organization: NR
Year: 2023
Status: Active
NB 185 ISSUE 8
Title: Signal Maintenance Contingency Planning
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/039 ISSUE 1
Title: Assessment and Certification of Protective Coatings
Organization: NR
Year: 2023
Status: Active
NR/L2/INF/02202 ISSUE 7
Title: Records Management of Health and Safety Files
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191 ISSUE 3
Title: Mining Manual
Organization: NR
Year: 2023
Status: Active
NR/L2/ENV/120 ISSUE 2
Title: Waste Management
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/021 ISSUE 5
Title: Personal Protective Equipment (PPE)
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/00130 ISSUE 2
Title: Creating a Site of Work Segregated from the Railway
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/11774 ISSUE 5
Title: Clamp Lock Handbook
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/30014 ISSUE 22
Title: Signalling Works Testing Handbook
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/2102 ISSUE 12
Title: Design and Construction of Track
Organization: NR
Year: 2023
Status: Active
NR/L2/XNG/30020 ISSUE 3
Title: Level Crossings Design Handbook
Organization: NR
Year: 2023
Status: Active
NR/L3/SCO/314 ISSUE 3
Title: Engineering Assurance for T&RS, OTM and OTP Projects
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/10665 ISSUE 23
Title: Reliability Centred Maintenance of Signalling Equipment
Organization: NR
Year: 2023
Status: Active
NR/GN/CIV/400 ISSUE 3
Title: Operational Property Design Manual
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/6100 ISSUE 6
Title: The Installation and Maintenance of Stretcher Bars
Organization: NR
Year: 2023
Status: Active
NR/SP/TRK/1110 ISSUE 2
Title: Qualification and Certification of Non-Destructive Testing Personnel
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/001 ISSUE 23
Title: Inspection and Maintenance of Permanent Way
Organization: NR
Year: 2023
Status: Active
NR/L3/CIV/040 ISSUE 3
Title: Work Instruction for the Use of Protective Coating Systems
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/29987 ISSUE 9
Title: Working on or About 25 kV A.C. Electrified Lines
Organization: NR
Year: 2023
Status: Active
NR/GN/CIV/002 ISSUE 6
Title: The Use of Protective Coatings and Sealants
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/006 ISSUE 7
Title: Maintenance and Contents of the National Hazard Directory (formerly NR/L2/MTC/006)
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/019 ISSUE 12
Title: Safety of People at Work on or Near the Line
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27240 ISSUE 12
Title: Distribution Work Instructions
Organization: NR
Year: 2023
Status: Active
NR/L3/SIG/19808 ISSUE 5
Title: Hy-Drive Supplementary Point Drive System
Organization: NR
Year: 2023
Status: Active
NR/L3/ELP/27250 ISSUE 7
Title: Conductor Rail Equipment - Design and Maintenance Working Instructions
Organization: NR
Year: 2023
Status: Active
NR/GN/CIV/100/08 ISSUE 1
Title: Strategic Design Manual: Investment in Stations
Organization: NR
Year: 2023
Status: Active
NR/GN/CIV/300/02 ISSUE 1
Title: Compliance Design Manual: Security at Stations
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/01 ISSUE 2
Title: Mining Manual: Managing the Risk from Abandoned Underground Mines to Existing Infrastructure
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/03 ISSUE 2
Title: Mining Manual: Inspection of Surface Mining and Tips
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/06 ISSUE 2
Title: Mining Manual: Notices of Approach for Mineral Extraction
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/08 ISSUE 2
Title: Mining Manual: Inspection of Working Underground Mines
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/00130/01 ISSUE 2
Title: Creating a Site of Work Segregated from the Railway: On a Platform Within a Station Environment
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/00130/03 ISSUE 2
Title: Creating a Site of Work Segregated from the Railway: Within a Possession
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/019/01 ISSUE 2
Title: Safety of People at Work on or Near the Line: Module 01 - Planning and Working for Fault, Failure, and Incident Response
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/019/03 ISSUE 3
Title: Safety of People at Work on or Near the Line: Module 03 - Planning and Working Using Protection Arrangements and Warning Systems
Organization: NR
Year: 2023
Status: Active
NR/GN/CIV/200/06 ISSUE 1
Title: Station Design Manual: Retail Design Manual for Stations
Organization: NR
Year: 2023
Status: Active
NR/GN/CIV/400/02 ISSUE 1
Title: Operational Property Design Manual: Low and Net Zero Carbon Plant Room Guide
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/11774/SR0001SB ISSUE 2
Title: Network Rail Clamplock Torque Specifications SR0001SB
Organization: NR
Year: 2023
Status: Active
NR/L2/OHS/019/06 ISSUE 1
Title: Safety of People at Work on or Near the Line: Module 06 - Planning and Working for Isolation Duties and Possession Support
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/11774/SRD0401RA ISSUE 2
Title: Network Rail Clamplock Switch Diamond MK2 Installation SRD0401RA
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/02 ISSUE 2
Title: Mining Manual: Planning Consultations for Mineral Extraction
Organization: NR
Year: 2023
Status: Active
NR/L2/SIG/30009/E042 ISSUE 1
Title: Signalling Principles Handbook: Absolute Block
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/6100/MOD01 ISSUE 2
Title: The Installation and Maintenance of Stretcher Bars: Glossary of Stretcher Bar Terminology
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/05 ISSUE 2
Title: Mining Manual: Managing the Risk from Mining in Design and Construction
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/07 ISSUE 2
Title: Mining Manual: Inspection of Abandoned Underground Mines
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/6100/MOD03 ISSUE 6
Title: The Installation and Maintenance of Stretcher Bars: Installing Stretcher Bars and Setting them to the Correct Length
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/6100/MOD05 ISSUE 3
Title: The Installation and Maintenance of Stretcher Bars: Fixed Stretcher Bars
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/6100/MOD07 ISSUE 2
Title: The Installation and Maintenance of Stretcher Bars: Lock Stretcher Bars
Organization: NR
Year: 2023
Status: Active
NR/L2/TRK/6100/MOD09 ISSUE 3
Title: The Installation and Maintenance of Stretcher Bars: Stretcher Bar Equipment Catalogue
Organization: NR
Year: 2023
Status: Active
NR/L2/CIV/191/09 ISSUE 2
Title: Mining Manual: Management of Mining Related Incidents
Organization: NR
Year: 2023
Status: Active


Advertisement